Skip to content

Daily EV news · Global · 20 November 2026

All Global EV news

Every item reviewed before publishing · sources cited inline

Electric Vehicles

Musk confirms Tesla is developing a Model Y without steering wheel or pedals, seating up to seven

Speaking at the New York Times DealBook summit on 18 November, Elon Musk said Tesla is working on a fully autonomous Model Y variant with no steering wheel or pedals, able to carry six or seven people. He said the two seat Cybercab would meet about 90% of passenger demand by kilometres travelled, with the larger vehicle aimed at families and groups. Tesla already runs Model Y vehicles in its US robotaxi fleet, but these keep conventional driving controls. The report comes from a French language outlet.

Why it matters

A larger autonomous vehicle alongside the Cybercab points to a broader driverless fleet that would need high utilisation charging and depot capacity. CPOs and site developers eyeing robotaxi demand should watch how Tesla plans to charge and manage these fleets, though no timings or figures have been given.

Global
20 Nov 2026

Tesla (global) · Source

JLR confirms early 2027 launch for Range Rover GT as a battery electric vehicle, with hybrid to follow later

JLR CFO Richard Molyneux said on Tata Motors Passenger Vehicles' Q2 FY27 earnings call that the Range Rover GT will launch as a BEV in early 2027, with a hybrid variant to follow within a reasonable timeframe but not during 2027. The model will sit below the larger Range Rover, with a lower seating position and lower pricing within the luxury segment, and no launch markets have been specified. JLR also said it has received nearly 5,000 orders for the Range Rover BEV, which was not yet available to see or drive, and is working through the production ramp-up for its electric models.

Why it matters

A further premium BEV from JLR points to a growing luxury electric vehicle base that will need reliable high power charging, particularly at destination and premium sites. The absence of confirmed launch markets and the staggered hybrid timing make it hard to forecast where and when demand will land, so CPOs should treat this as a pipeline signal rather than a firm deployment trigger.

Global
20 Nov 2026

JLR (global) · Source