InstaVolt is rolling out 273 EV charging units across 18 British Land retail park sites in the UK, with five locations already live and the remainder due for activation in the coming months. Two sites under development at Reading Gate and Kingston, Milton Keynes will feature on-site battery energy storage to ease grid demand and support reliable charging at peak times. All sites operate 24/7 with off-peak rates available after 8 pm via the InstaVolt app, announced 27 July 2026.
Why it matters: This represents one of the largest retail park charging rollouts in the UK, demonstrating how property developers and CPOs are integrating battery storage to de-risk grid constraints and deliver resilient ultra-rapid charging at high-footfall retail destinations. The scale and storage integration offer a procurement blueprint for similar retail and mixed-use developments.
Arnold Clark Charge has partnered with Radius to give fleet operators access to its network of over 400 chargers across more than 60 UK locations, most featuring ultra-rapid units up to 150kW. Launched in 2024 as part of a £30m investment, the network will now be available to around 500,000 Radius fuel and EV charge cardholders at a rate of 55p per kWh. The Arnold Clark Charge app allows users to reserve charging slots in advance.
Why it matters: The deal significantly expands fleet access to a large, privately funded charging network and demonstrates how partnerships between charge point operators and fleet payment providers can accelerate commercial EV adoption. The 55p per kWh tariff and slot reservation feature address two key fleet pain points: cost predictability and operational planning.
Arnold ClarkRadiusUnited Kingdom27 Jul 2026Source Bedford Borough Council has partnered with Connected Kerb to deploy an initial 260 EV charging sockets across Bedford, Kempston and surrounding villages, focusing on areas without off-street parking. The rollout is funded by the Government's Local Electric Vehicle Infrastructure (LEVI) fund, with the council planning to expand the network to more than 900 sockets in total to meet growing demand. Connected Kerb will install, maintain and manage the charging infrastructure on behalf of the council's Highways Engineering team.
Why it matters: The 260-socket first phase and 900-plus socket target signal a substantial procurement opportunity in a borough prioritising on-street charging for residents without driveways. CPOs and installers should note the LEVI-backed, council-led model with a single operator managing the network, a structure likely to be replicated in similar local authorities.