Skip to content

Daily EV news · US · 27 November 2026

All US EV news

Every item reviewed before publishing · sources cited inline

Grid & Energy

Minnesota official urges opponents of Lemon Hill solar project near Rochester to propose a better site as local power demand grows

Neighbours of the proposed Lemon Hill solar development near Rochester, Minnesota, are worried about losing prime farmland, according to ABC 6 as reported by The Cool Down. Opponents held a residents' briefing from which local media were asked to leave, and organisers said farm owners could choose whether their land is involved. The project was still under permit review as of 23 November, and a state official said the area has already been told that power is needed there.

Why it matters

Local opposition over farmland and siting can slow permitting for new generation, and the article ties the project to rising electricity needs in the area. CPOs and procurement teams planning charging sites in the region should note that grid capacity and local acceptance of new supply may shape project timelines.

United States
27 Nov 2026

Source

Policy & Market

US Congress passes bill making e-bike battery safety standards mandatory

The US Senate unanimously passed H.R. 973, the Setting Consumer Standards for Lithium-Ion Batteries Act, on 19 November, after the House approved it in April 2025 by 365 votes to 42. The bill now goes to the president for signature and would require the Consumer Product Safety Commission to turn UL 2271, UL 2849 and UL 2272 into mandatory federal standards within 180 days of enactment. These standards are currently largely voluntary nationally, though places such as New York City already require UL certification, as reported in the article.

Why it matters

A nationwide UL certification requirement for e-bikes, batteries and e-scooters would replace the current patchwork of local rules, which matters for anyone sourcing or supplying light electric vehicle and micromobility charging hardware. Suppliers and operators should check that products and battery systems align with the three named UL standards ahead of the 180 day deadline.

United States
27 Nov 2026

Source