US EV charging expansion is creating a new infrastructure economy, says industry commentary
By Eve
A commentary on America's EV charging boom argues that charging stations, electricity networks, battery storage, smart energy systems and digital services are forming a commercial sector in its own right. It cites industry projections that the United States could need between 11 million and 26 million privately accessible charging ports, spanning residential, workplace, public parking and major route settings. The excerpt is cut off before the public charging figure, and it names highway hubs, shopping centres, fleet depots and home charging as areas of opportunity.
Why it matters
The piece frames the opportunity as building reliable, well located and commercially viable networks rather than simply installing more chargers, which is the standard CPOs and buyers will be judged on. The wide projected range for private ports points to demand across many site types, though the excerpt gives no timeline or public port figure.
Source
- Original title
- “America’s EV Charging Boom: How Infrastructure Expansion Is Creating New Business Opportunities”
- Published
- 28 November 2026
- Updated
- 29 November 2026
In this story
- Topic
- EV Charging
- Place
- United States
Related news
Guide for non-Tesla drivers on checking Tesla Superchargers before a stop in France and Europe
A French-language practical guide advises drivers of other brands to check, station by station in the Tesla app under "Rechargez votre VE", whether a Supercharger is open to non-Tesla vehicles, since a Tesla logo or a nearby open site is not proof of access. It notes that, according to Tesla, most Superchargers run 24 hours a day but some have limited hours, and that entry details such as gates or car park levels should be checked, as neighbouring shop hours do not necessarily apply to the chargers. The excerpt is cut off before the guide covers real-time availability, plugging in, payment and vacating the bay.
Why it matters
Open access at Tesla sites is decided site by site, so route planning and driver guidance for fleets and CPOs cannot assume a Tesla pin means a usable charger. Clear access, hours and entry information remains a differentiator for reliability, whether you operate sites or compete with them.
India's Ministry of Heavy Industries defers national rollout of Unified Bharat e-Charge after weak pilot results
The Ministry of Heavy Industries will not expand Unified Bharat e-Charge nationally until issues found in pilot testing are resolved, according to businessline. Around 12 charging network operators are onboarded, but the platform remains limited to five pilot regions (Maharashtra, Karnataka, Delhi-NCR, Haryana and Rajasthan) nearly four months after launch, with access restricted to the BHIM app. Between 3 and 13 September, only nine of 148 transaction attempts led to completed charging sessions, a 6.1 per cent completion rate.
Why it matters
A national interoperable payment layer is not yet available to India's CPOs, so expansion timelines remain uncertain. Operators cited non-functional chargers, incompatible connectors, power cuts and difficulty identifying charging guns as the causes, which suggests site reliability and hardware readiness will decide whether CPOs benefit once the platform scales.
MHI · Bharat e-Charge · Source
Lucid patent describes DC linked charging station that lets EVs share power
CarBuzz has found a Lucid patent for a "bi-directional vehicle-to-everything power sharing architecture", in which every plug on a charging station is linked on the DC side. This would let vehicles share power without extra conversion hardware or the losses of converting to AC and back. The system could prioritise one car over another, giving it all the power it can accept, and in some situations draw power from a non-priority car to charge the priority car faster, as well as charge more efficiently from solar or stationary battery storage.
Why it matters
A shared DC architecture could change how sites are specified, as it targets the current problem of multiple plugs competing for a single power supply, for example a 100 kW station serving two cars that can each accept 100 kW. It is only a patent, so buyers should treat it as a signal of where charger design may head rather than a product they can procure today.