Anker SOLIX S5000 5kWh power station falls to $2,375 in Black Friday sale, with Segway Max G3 Plus scooter at $1,000
By Eve
Electrek reports that Anker's expanded SOLIX Black Friday sale has cut the S5000 5,024Wh portable power station to an exclusive $2,374.99 shipped, using the code 9TO5DEALS5, which beats Amazon by $12. Anker says savings run up to 54% across the SOLIX lineup, and the code applies to orders over $1,000. The same roundup lists the Segway Max G3 Plus electric scooter at a new $1,000 low, the Navimow i215 LiDAR robot mower at $1,329, and eufyCam S4 solar security kits from $950.
Why it matters
Large portable batteries such as the 5kWh S5000 are relevant to temporary or off-grid charging setups and site backup, and this is a consumer retail promotion with US pricing. Procurement teams should treat it as a price reference point rather than a commercial supply offer, since the code and discounts are time limited.
Source
- Source
- https://electrek.co/2026/11/20/anker-s5000-5kwh-power-station-segway-max-g3-plus-e-scooter-more/
- Original title
- “Anker S5000 5kWh power station back at $2,375 exclusive low ($1,225 off), Segway Max G3 Plus e-scooter new $1,000 low, more”
- Published
- 20 November 2026
- Updated
- 21 November 2026
In this story
- Topic
- Grid & Energy
- Place
- United States
Related news
Alberta homeowner with 12.5 kilowatt solar system asks Reddit if overproduction is a problem after building up $2,500 in credits
An Alberta homeowner told Reddit's r/solar forum that their 12.5 kilowatt system, installed in 2022, has meant no power bill since March 2023 and more than $2,500 in credits. Commenters said this should not cause problems with the wires owner or power company, with one noting that an approved permit means the owner is fine and another saying surplus gives a buffer in poor weather. The account was reported by The Cool Down and is anecdotal.
Why it matters
It is a single user report, not a regulatory finding, but it shows that grid connected solar owners in Alberta are accumulating export credits with no sign of utility pushback. CPOs and developers pairing charging with onsite solar may want to check local rules on credits and permit approvals for their own sites.
JA Energy Storage launches in-house battery passport platform ahead of EU Battery Regulation deadline
JA ESS has launched its own battery passport data platform to support lifecycle information management and help companies prepare for upcoming EU rules. It is hosted in the company's own cloud environment, so the team is directly responsible for data policies, access permissions and future updates. Under the EU Battery Regulation, battery passports become mandatory from 18 February 2027 for light vehicle batteries, electric vehicle batteries and industrial batteries above 2 kWh placed on the market or put into service.
Why it matters
Storage systems paired with charging sites will need a compliant passport, so procurement teams should ask suppliers now how they will handle traceable data, access control and QR code and ISO/IEC 15459 based identifiers. Suppliers with working platforms ahead of the 2027 deadline may carry less compliance risk in tenders.
energyRe agrees to sell 317 MWdc South Carolina solar portfolio to Enel Green Power North America
energyRe has agreed to sell 100% of a portfolio of utility-scale solar projects in South Carolina, totalling roughly 317 MWdc, to Enel Green Power North America. The deal is expected to close in the first quarter of 2027, subject to customary conditions including required U.S. regulatory approvals, and energyRe will remain construction manager through commercial operation. The company says it has broken ground on approximately 450 MW in the last year and has nearly 700 MW in operation or late-stage development, within a 1.8+ GW portfolio of 20 projects.
Why it matters
Large solar assets changing hands to an established owner and operator signals continued capital appetite for new generation in South Carolina, which bears on the future power supply behind regional charging demand. For CPOs and developers, it is a reminder that development platforms are being monetised at scale, with the original developer staying on for construction delivery.
energyRe (us) · Enel Green Power North America (us) · Source