Skip to content
EV Charging
United States

Arlington County raises public EV charging fees by 72% to cover capital and electricity costs

By Eve

The Arlington County Board in Virginia approved a 72% increase to base charging fees, from 17.46 cents per kilowatt hour to 30 cents per kilowatt hour, effective 1 November. The rise addresses capital costs for the county's 51 public charging ports and a 25% jump in electricity prices that took effect on 1 October, which pushed up costs for EV charging accounts by 23%. Board members also instructed the county manager to review contracts with charging providers to ensure no unauthorised fees are being added.

Why it matters

The tariff hike illustrates how rising electricity costs and infrastructure investment pressures are forcing public operators to adjust pricing models, a trend that could influence contract terms and revenue forecasts for CPOs and equipment suppliers. The directive to audit provider contracts signals tighter scrutiny of fee structures, relevant for firms negotiating municipal charging agreements.

Source

Original title
“Arlington raises its EV charging fees by 72%”
Published
24 October 2026
Updated
29 October 2026

In this story

Related news

Solar powered EV charging in Andhra Pradesh still at an early stage despite favourable conditions

A report on Nellore says Andhra Pradesh has abundant sunshine, a growing renewable energy ecosystem and rising interest in electric mobility, but solar powered charging remains nascent. Stations use rooftop or ground mounted solar panels with Battery Energy Storage Systems (BESS) to smooth fluctuations, drawing from the grid only when necessary. The article notes that public charging infrastructure in the state remains sporadic despite growing EV sales and strong government backing, and that Convergence Energy Services Ltd. (CESL), a subsidiary of Energy Efficiency Services Ltd. (EESL), was the first to deploy an integrated solar powered charging station in India.

Why it matters

Lower electricity costs at solar and BESS equipped sites could let charge point operators pass savings on to drivers, which makes Andhra Pradesh a potential market for integrated solar plus storage charging projects. The patchy public network, particularly for intercity travel, points to unmet demand for developers and funders.

India
31 Oct 2026

Source

Los Alamos County to open new DC fast charging stations at Mesa Public Library with ribbon cutting on 2 November

Los Alamos County has invited the community to a ribbon cutting ceremony on 2 November marking the opening of new Direct Current (DC) fast charging stations in the Mesa Public Library parking lot. The project was funded in part by the New Mexico Department of Transportation (NMDOT). County Sustainability Manager Angelica V. Gurule described the stations as a step toward expanding public EV charging infrastructure and supporting more sustainable transport in the community.

Why it matters

This is another example of state transport funding supporting municipal DC fast charging at public civic sites, a route that can open opportunities for CPOs and installers working with local authorities. The announcement gives no figures on charger count, power output or funding value, so those details would need to be confirmed directly.

United States
30 Oct 2026

Source

InstaVolt agrees national framework with Whitbread to bring ultra-rapid charging to Premier Inn sites

InstaVolt has agreed a national framework with Whitbread PLC, owner of Premier Inn, to build a pipeline of new ultra-rapid charging at well-located Premier Inn sites across the UK. Premier Inn has more than 845 hotels across the UK and Ireland. Earlier this year InstaVolt agreed to acquire 228 GeniePoint locations from Equans, comprising more than 260 chargers, including more than 100 locations associated with the Whitbread estate, and it plans to upgrade existing charging at Premier Inn sites with ultra-rapid hardware, enhanced grid connections where required and improved signage.

Why it matters

A national framework with the UK's largest hotel brand shows how a CPO can secure a repeatable host-site pipeline rather than negotiating site by site, building on an acquired footprint. Competing operators and landlords should note the pairing of hospitality dwell time with ultra-rapid upgrades of inherited charging assets.

United Kingdom
30 Oct 2026

Instavolt · Premier Inn · Source