Ascent Energy Services partners with Powerverse to launch its own EV charging app
By Eve
Ascent Energy Services, a national approved installer, has launched an Ascent-branded app that lets drivers choose from a range of leading EV chargers and manages the whole installation experience, with built-in point of sale software. Chargers are connected to the Powerverse platform from day one, giving customers access to Raya Rewards, which pays cash back to drivers for smart charging at times that help the grid. The announcement states that drivers no longer need to be with a particular energy retailer to benefit from smart charging.
Why it matters
Installers are bundling hardware choice, point of sale and grid flexibility rewards into a single branded offer, which may shape how installation partners are specified and compared in domestic, fleet, commercial and dealership work. CPOs and buyers may wish to consider how retailer-independent smart charging rewards affect customer expectations and charger connectivity requirements.
Source
- Published
- 11 November 2026
- Updated
- 12 November 2026
In this story
- Topic
- EV Charging
Related news
Tesla expands Goulburn Supercharger site in NSW from 20 to 28 stalls, regaining Australia's largest fast-charging site title
Tesla has expanded its Supercharger site at Lockyer St in Goulburn, NSW, from 20 to 28 stalls, with up to 300 kW available per stall, in time for the Christmas and New Year travel period. Pricing is $0.48/kWh for Tesla owners and members (down from $0.52/kWh at opening) and $0.68/kWh for non-Tesla drivers (down from $0.73/kWh). The site had briefly been overtaken by a 24-bay BP Pulse site near Melbourne airport, and The Driven reports it is also the largest site in the southern hemisphere.
Why it matters
Tesla is scaling a high-power corridor hub on the Sydney to Canberra route while cutting prices, including for non-Tesla drivers, which raises the benchmark for rivals on pricing and bay count. CPOs and site developers planning Australian corridor sites should expect competition on both capacity and tariff.
Visteon-Shinry Power Electronics and Infineon develop single-stage GaN onboard charger for EVs
Visteon-Shinry Power Electronics (VSPE), a joint venture of Visteon and SHINRY Technologies, is working with Infineon Technologies on a single-stage onboard charger built on Infineon's gallium nitride (GaN) monolithic bidirectional switches. The design is intended to support 22 kW three-phase and 19.2 kW single-phase AC charging, with vehicle-to-everything (V2X) bidirectional capability, and removes the bulk capacitors found in conventional two-stage onboard chargers. The companies say this improves reliability, reduces complexity, allows more compact packaging and lowers cost, as reported in a newswire item posted on 13 November 2026.
Why it matters
Onboard charger design affects vehicle-side bidirectional capability, which shapes how V2X and grid services could be offered alongside charging infrastructure. The cost and packaging claims are the companies' own and no pricing or production timeline is stated, so buyers should treat them as early indications rather than commitments.
MACBETH project publishes CharIN-led specification for multipoint MCS truck charging hubs
The EU-funded MACBETH project has published Deliverable D4.1, a specification for multipoint Megawatt Charging System (MCS) hubs for electric trucks, authored by the Charging Interface Initiative (CharIN) with VTT Technical Research Centre of Finland. It sets out two reference site layouts, a forward-only drive-through and a design with a dedicated waiting buffer zone, and two power concepts: a shared power cabinet that distributes power dynamically, and a modular multi-cabinet approach that scales by adding independent cabinets. Vehicle-to-charger communication is based on ISO 15118-20 with its MCS profile over a 10BASE-T1S physical layer, and the document will guide the project's pilots in Belgium and Sweden. MACBETH is a Horizon Europe project coordinated by VTT that ends in January 2029.
Why it matters
D4.1 offers a shared reference for site layouts, power architectures and communication requirements, which could inform how MCS hub tenders and technical specifications are written. Buyers and CPOs weighing shared cabinet efficiency against modular redundancy and phased build out now have a common framework to compare against.