T&E warns French and German battery cell quota would cover only 13% of Europe's planned 2030 output
By Eve
A new Transport & Environment study finds that the agreement reached by France and Germany on 16 October 2026, which proposes a 20% quota of European battery cells in relevant vehicles by 2030, would guarantee demand for only 13% of the cell production planned in Europe for that year. The proposal feeds into Brussels' draft Industrial Accelerator Act, a regulation intended to support European industrial output through local manufacturing criteria. T&E argues the threshold is far too low, noting that more than half of the cells in electric cars sold in the EU are already produced on the continent.
Why it matters
A weak local content threshold in the Industrial Accelerator Act could leave planned European gigafactories, including those in France, short of guaranteed buyers, adding uncertainty to the battery supply chain behind EV and storage procurement. Stakeholders should watch how the final quota is set as the regulation advances.
Source
- Original title
- [FR] “Avec cet accord franco-allemand, l'Europe risque de saboter sa propre industrie des batteries pour voitures électriques...”
- Published
- 20 November 2026
In this story
- Topic
- Policy & Market
- Places
- France · Germany · European Union
Related news
IEA warns UK pay-per-mile plans on top of existing motoring taxes could discourage the switch to cleaner vehicles
A new Institute of Economic Affairs report by Professor David Bailey of Birmingham Business School, Reforming Road Tax: The Case for a Fair, Sustainable Pay-per-Mile System in the UK, calls adding mileage charges on top of current motoring taxes the "most politically damaging design" for road pricing. From April 2028 the Government plans to charge electric car drivers 3p per mile and plug-in hybrid drivers 1.5p per mile, both on top of Vehicle Excise Duty, meaning £360 a year at 12,000 miles and £600 at 20,000 miles for an electric car. The IEA calculates that a plug-in hybrid driver covering 20,000 miles would pay £300 in mileage charges, plus £200 standard VED and a £440 Expensive Car Supplement for cars listed above £40,000, reaching £940 a year before fuel duty.
Why it matters
A new per-mile cost for electric and plug-in hybrid drivers could weaken the running cost case for switching, which feeds through to charger demand and utilisation assumptions in site business cases. CPOs and funders should watch how the April 2028 charge develops, as it may influence driver behaviour and the pace of electric vehicle uptake.
Indian Centre open to additional funding for EV charging infrastructure if needed, says PM adviser
A news headline reports that the Centre is open to extra funding for EV charging infrastructure if required, according to an adviser to the Prime Minister. A related headline on the same page says Kumaraswamy called for a reliable EV charging network, stressing uptime and easy payments. The excerpt gives no funding amounts, timelines or scheme details, and the surrounding items are Indian energy stories, not UK ones.
Why it matters
Any additional public funding is conditional and unquantified for now, so it is a signal to watch rather than a basis for bids. The stress on uptime and easy payments suggests that reliability and user experience could shape future support and procurement expectations in India.
India open to more EV charging funds once current allocation is exhausted, says PM adviser
Tarun Kapoor, adviser to Prime Minister Narendra Modi, said the government would consider a next phase of support if existing funds run out. He spoke on Friday at the SIAM National EV Charging Day, where the industry body held its first Growth and Readiness for EV Infrastructure Dialogue (GRID). Under PM E Drive, Rs 2,000 crore is earmarked for public charging, and as of September 28, 2026, Rs 851 crore had been approved for 8,147 chargers through three oil marketing companies and 10 states. Kapoor also urged power distribution companies to prepare.
Why it matters
Funding is not capped at the current Rs 2,000 crore, but more money depends on the existing allocation being used up, so approval and deployment pace will shape the next phase. CPOs and bidders should note that the subsidy can cover grid connections and charging equipment, with the level depending on location.