Skip to content
EV Charging
United States

Bernalillo County opens first DC fast charger in downtown Albuquerque

By Eve

Bernalillo County opened a 200 kW Level III DC fast charging station at the Mid-Region Council of Governments, 809 Copper Ave. NW, on 6 November 2026, with many EVs able to fully charge in about 30 minutes. The project was funded by a $500,000 New Mexico Department of Transportation grant, local matching funds from the county and a $50,000 PNM rebate, and the site has built in capacity for a second port. The county currently operates 24 EV charging ports and plans to add 14 more.

Why it matters

This is a clear example of stacked funding, combining a state grant, county match and a utility rebate, to deliver a public DC fast charger in an urban core. The built in capacity for a second port and the 14 planned ports point to further county activity for CPOs and installers to watch.

Source

Original title
“BernCo Celebrates Opening of Downtown Albuquerque’s First DC Fast Charge EV Station”
Published
6 November 2026
Updated
12 November 2026

In this story

Related news

Edmonton homeowner asks Reddit how to charge a new Tesla mainly from rooftop solar and is warned about extra equipment

In a Reddit r/Solar thread, reported by The Cool Down, an Edmonton homeowner asked how to charge a new Tesla mostly from solar, particularly in summer when they would be selling and buying at peak rates. The poster said an electrician had offered to install a dedicated garage connection, and that the house's 100-amp service also supports a hot tub, air conditioning and other large loads. One commenter warned that charging purely from solar would need equipment such as a string inverter that monitors grid imports and exports and directs solar to specific loads, while another said they plug in on arrival home, charge to 80% daily before dark and have had no electric bill in 2 years.

Why it matters

The thread shows residential demand for solar-matched charging running into practical limits, including a 100-amp service and the need for load-aware equipment, which is relevant to anyone specifying home charging or energy management products. It also signals that installers and suppliers who can offer simple solar-aware charging control may find an opening, though this is one anecdotal forum discussion rather than market data.

Canada
15 Nov 2026

Tesla · Source

Oklahoma to Washington EV road trip prompts advice on $7 Electrify America pass for 25% off charging

A driver planning a trip from Oklahoma to Washington in a 2024 Ford Mustang Mach E asked Reddit how to keep charging costs down, with ABRP estimating 38 to 42 hours of journey time based on roughly 250 miles of range. One commenter recommended Electrify America Pass Plus, which they said costs $7 per month, gives 25% off charging and carries no early cancellation fee, so $28 of eligible charging would cover the fee. The driver hopes to use Tesla Supercharger off peak rates and avoid prices of $0.60 per kilowatt hour or more, according to The Cool Down.

Why it matters

Long distance drivers are comparing membership discounts and price thresholds before they set off, and $0.60 per kilowatt hour is named as a price they want to avoid. CPOs and network operators can read this as evidence that subscription value and off peak pricing influence where drivers choose to charge.

United States
14 Nov 2026

Source

US EV owner quoted $8,066.71 for a garage outlet expected to cost around $1,000

An electrician quoted $8,066.71 to install a 50-amp garage outlet for an EV owner who had expected to pay around $1,000, according to a report from The Cool Down based on a Reddit post. The job involved 25 feet of cable through an unfinished basement ceiling into an attached garage, with cable at $1,372.50, a breaker at $615.42 and a breaker lockout at $448.38, plus a separate $5,301.90 charge for the outlet, circuit, GFCI breaker and charger installation. Several Reddit users described installations costing substantially less, including ones with longer cable runs.

Why it matters

The gap between homeowner expectations and installer quotes shows how opaque and inconsistent residential charging installation pricing can be, which affects demand for home charging and the case for itemised, benchmarked quotes. Installers and CPOs working in the home and small commercial segment may find that clear pricing is a competitive advantage.

United States
14 Nov 2026

Source