Osborne builds charging hubs for Tesla, IONNA and EVgo across United States
By Eve
Kansas based general contractor Osborne, in business since 1976, is building charging sites for major charge point operators including Tesla, IONNA and EVgo. The firm handles construction work for CPOs and charging as a service providers, who design and coordinate infrastructure but subcontract the physical build. Osborne's role covers the construction layer of the charging stack, working with turnkey providers who offer single point of contact packages to fleet operators.
Why it matters
General contractors like Osborne are essential to the charging infrastructure supply chain, executing site builds for CPOs and CaaS providers who increasingly dominate procurement. Understanding which contractors win work from major operators helps identify capacity and delivery partners in the infrastructure rollout.
Source
- Original title
- “Building charging hubs for Tesla, IONNA and EVgo: Inside Osborne’s work”
- Published
- 16 October 2026
- Updated
- 17 October 2026
In this story
- Topic
- EV Charging
- Place
- United States
Related news
Rivian takes second place in US EV brand sales for Q3 2026, driven by Amazon fleet contract
Rivian sold 19,239 electric vehicles in Q3 2026, a 45.7% year on year increase that placed it second among EV brands in the United States, according to Cox Automotive data. The majority of sales came from the EDV500/700 commercial fleet vehicle supplied under Rivian's Amazon contract, rather than the consumer R2 model. Tesla remained dominant with 144,094 sales in the quarter, whilst Toyota took third place with 12,904 units and Cadillac fourth with 12,358.
Why it matters
The figures highlight the commercial fleet segment as a major volume driver for EV manufacturers, with Rivian's Amazon delivery van contract proving more significant than consumer models. For charge point operators and procurement teams, the growth in purpose built commercial EVs signals expanding demand for depot and fleet charging infrastructure beyond passenger vehicle networks.
Tesla adds solar and tariff aware charging to Gen 3 Wall Connector via Powerwall integration
Tesla's firmware version 26.34 enables its Gen 3 Wall Connector to coordinate with Powerwall systems for smart charging based on solar generation and utility rates. In Savings mode, the charger uses time of use tariffs and solar output to schedule low cost charging, while Self Powered mode directs surplus solar to the vehicle battery. The feature extends to older Powerwall 2 units as well as newer installations.
Why it matters
Home charging hardware that responds to solar availability and dynamic tariffs could reduce grid demand during peak periods and improve the business case for residential solar plus storage installations. For CPOs and installers, it signals growing integration between vehicle charging, energy storage and tariff optimisation in the domestic segment.
Tesla secures 90% of output from 450 MW Arizona solar plant before construction starts
ContourGlobal launched construction of Project Sterling, a 450 MW solar facility with battery storage in Mohave County, Arizona, on 6 October. Tesla has already committed to purchasing approximately 90% of the plant's future output. The site will cover more than 800 hectares and feature over 760,000 solar panels, with commissioning expected in 2028.
Why it matters
The deal shows a major EV maker locking in clean generation capacity years ahead of delivery, a model that could inform how charge point operators secure renewable power for large scale networks in Europe and beyond.