Skip to content
Grid & Energy
United Kingdom

UK Government publishes clean electrification roadmap and backs two offshore wind farms

By Eve

The UK Government has launched its clean electrification roadmap as the Prime Minister outlined plans to invest in two offshore wind farms. The Clean Energy Industries Sector Plan targets at least a doubling of investment in frontier clean energy industries to over £30 billion a year by 2035, with a further £700 million for Great British Energy, and the Clean Industry Bonus has used £204 million of public investment to leverage £3.4 billion of private investment in British factories, ports and supply chains. The roadmap also cites the ZEV Mandate as driving EV uptake and phasing out new petrol and diesel only cars from 2030, while ChargeUK chief executive Shane Brennan said committing to electrification whilst considering weakening EV targets is a contradiction in terms.

Why it matters

The roadmap names EV charging as an investment and jobs opportunity, but uncertainty over possible changes to the ZEV Mandate leaves demand signals unclear for CPOs and their supply chains. Procurement teams should watch how the supply chain funding and any mandate revisions shape project timelines and investment cases.

Source

Original title
“Clean electricity roadmap and investment announced by UK Government”
Published
16 November 2026

Related news

Experts warn weakening the UK ZEV mandate would harm the car industry and consumers ahead of Climate Change Committee letter

Campaigners and experts say watering down the UK zero emissions vehicle mandate would slow the electric car market and hamper efforts to reduce the cost of living, according to an exclusive in The Guardian. The mandate currently requires 80% of new car sales to be electric from 2030 and 100% from 2035, and it has been reported that Labour is poised to reduce those targets. The Climate Change Committee, chaired by Nigel Topping, is due to write to ministers on Wednesday on the effects of any change on the cost of living and net zero targets.

Why it matters

Any loosening of the 2030 and 2035 sales trajectory would weaken the long-term demand signal that underpins charge point investment, site pipelines and tender volumes. CPOs and suppliers should watch the Climate Change Committee intervention and the government response closely when assessing utilisation forecasts and rollout plans.

United Kingdom
16 Nov 2026

UK Government · Source

UK opens second £38 million Depot Charging Scheme round with grant rate cut to 60%

The UK government has launched a second funding window for its Depot Charging Scheme, worth £38 million and aimed at fleet electrification. The grant rate has been reduced to 60%, and applications close on 26 February 2027. The details come from the announcement as reported in the news excerpt.

Why it matters

A lower grant rate means operators and CPOs bidding for depot projects must fund a larger share of capex themselves, which affects business cases and partner financing. The long window to 26 February 2027 gives time to prepare bids and line up co-investment.

United Kingdom
13 Nov 2026

UK Government · Source

Backup battery self-tests suspected of causing minute-by-minute pulsing in power grids on five continents

A team led by Dirk Witthaut, a physicist at Germany's University of Cologne, traced 60-second electrical fluctuations to uninterruptible power supplies at the Forschungszentrum Jülich campus, according to ScienceAlert citing work published in Nature Energy. Four buildings with backup power systems showed the pattern, brief bursts of battery current at one-minute intervals were tracked to the public high-voltage network connection, and the equipment manufacturer confirmed that automatic battery self-tests caused the activity. Digital clocks synchronised through external time signals appear to explain why independent systems run the checks in unison.

Why it matters

It shows how many small, battery-backed devices running time-synchronised routines can add up to measurable grid effects, a point relevant to anyone specifying or operating charging sites with onsite storage or backup power. Procurement teams may want to ask suppliers how automated battery tests and other scheduled functions are timed across a fleet of sites.

Global
16 Nov 2026

Source