EP Cube unveils 10 kVA residential storage system and 7.4 kW EV charger for UK market
By Eve
EP Cube, a Canadian Solar subsidiary, showcased its EP CUBE Single-Phase 2.0 residential energy storage system and Three-Phase Light C&I Solution at Solar & Storage Live UK 2026 in Birmingham. The residential system offers 5 to 40 kWh modular lithium-iron phosphate storage, a 10 kVA hybrid inverter supporting up to 15 kW of PV capacity, and integrates with a forthcoming 7.4 kW AC EV charger and smart home app. The all-in-one units stack 5 kWh battery packs and include dynamic tariff pricing AI for connected home energy management.
Why it matters
The integrated 7.4 kW charger and storage platform targets the UK residential retrofit and new-build market, offering procurement teams a single-vendor solution for PV, battery and EV charging installations. Dynamic tariff optimisation may appeal to installers and housing developers seeking to differentiate smart-home propositions in a competitive residential energy market.
Source
- Original title
- “EP Cube’s Energy Storage Solutions For Smarter, Connected UK Homes”
- Published
- 5 October 2026
In this story
- Topic
- Grid & Energy
- Place
- United Kingdom
- Tag
- EP Cube
Related news
750 affordable homes in UK now heated by mine water geothermal network
A new energy centre at Seaham Garden Village in the UK is now supplying low carbon heat to around 750 affordable homes using naturally warm mine water pumped from a Durham treatment facility. Energy Live News reported that the network has completed commissioning and is fully operational. The system uses geothermal processes that keep mine water at a relatively constant temperature year round, providing a dependable heat source instead of traditional heating fuel.
Why it matters
The operational mine water heating network demonstrates a replicable model for decarbonising heat in social housing developments, potentially informing procurement specifications for low carbon heating infrastructure at scale. The proven reliability of geothermal mine water as a consistent year round heat source may influence future district heating tenders and public sector energy resilience planning.
Tesla Powerwall autonomously grid-charged before peak rates to offset low solar yield in Arizona
A Tesla Powerwall owner in Tucson, Arizona, reported that the battery began charging from the grid at around 2:30 p.m. on a rainy day, ahead of a 3 to 7 p.m. peak rate window, after solar generation fell short. The homeowner had set the system to Saving mode and disabled Stormwatch, allowing the Powerwall to draw enough grid power to cover the high cost period. The case, shared on Reddit's r/Powerwall forum, illustrates how residential storage can automatically balance low renewable output with time of use tariffs.
Why it matters
The example shows demand side flexibility in action, with home batteries responding to tariff signals and weather conditions without manual intervention. For CPOs and utilities, it underscores the growing role of behind the meter storage in load shifting and the need for rate structures that reward or integrate such behaviour at scale.
Wound Type Current Transformer Market Forecast to 2035 Highlights EV Charging Infrastructure as Key Growth Driver
IndexBox's latest global market report identifies wound type current transformers as entering a decade of structurally higher demand through 2035, driven by electricity system digitalization, decarbonization and decentralization. Growth will be anchored in utility smart meter rollouts, renewable energy integration, EV charging infrastructure and industrial automation. The market is bifurcating between standardized catalog parts for high volume OEMs and customized, application engineered solutions for critical infrastructure.
Why it matters
For CPOs and charging network developers, the report signals that precision current measurement components essential for revenue grade metering and power quality monitoring in EV charging stations will see sustained supply and innovation through 2035. The bifurcation between standardized and custom solutions suggests procurement teams should assess whether catalog parts meet accuracy requirements or if critical sites warrant engineered transformer specifications.