Faraday Future announces FX Super One production roadmap and Tesla Supercharger access
By Eve
Faraday Future has unveiled a production roadmap for its FX Super One model and confirmed access to Tesla's Supercharger network in the United States. The announcement provides a timeline for bringing the FX Super One to market while expanding charging options for future owners through compatibility with Tesla's extensive charging infrastructure.
Why it matters
Tesla Supercharger network access is becoming a competitive requirement for EV makers, influencing procurement decisions as fleet operators and buyers prioritise vehicles with broad charging compatibility. The move signals continued consolidation around Tesla's North American Charging Standard, affecting infrastructure planning for charge point operators.
Source
- Original title
- “Faraday Future unveils FX Super One production roadmap, Tesla Supercharger access”
- Published
- 8 January 2026
- Updated
- 17 July 2026
In this story
- Topic
- Electric Vehicles
- Place
- United States
- Tags
- Faraday Future · Tesla
Related news
Tesla files permit for Semi service centre in Las Vegas as production ramps
Tesla has filed a building permit with Clark County, Nevada, for a dedicated Tesla Semi service centre at 3780 N Las Vegas Boulevard, marking one of the first concrete steps in building the service network for its electric Class 8 truck, which entered volume production two weeks ago. The site is a tenant improvement in a new shell building within the LV Logistics One industrial development, with neighbouring facilities offering 152,256 square feet, 32 foot clear height and 20 dock high doors. The permit status is awaiting plans, indicating construction drawings have not yet been submitted.
Why it matters
The filing signals Tesla is moving beyond production to establish the aftermarket infrastructure required to support commercial fleet operators, a critical step for CPOs and logistics firms evaluating Semi adoption. Las Vegas sits on the I-15 corridor, positioning the facility to serve a major freight route as Tesla scales deployment.
Tesla Cybertruck deliveries fall to 7,000 to 8,000 units in Q3 2026, far below 250,000 annual target
Tesla delivered 8,295 vehicles in its Other Models category in Q3 2026, down 48% year on year and the lowest since Q2 2021, with an estimated 7,000 to 8,000 units being Cybertrucks following the end of Model S and Model X production in April. The quarterly figure suggests an annual run rate of around 30,000 Cybertrucks, well short of the 250,000 capacity Tesla planned for the line. Production of Other Models fell 40% to 7,004 units in the quarter.
Why it matters
Weak Cybertruck uptake signals limited commercial fleet appetite for Tesla's electric pickup, potentially opening market share for rival electric vans and trucks that CPOs and fleet operators may favour for depot charging projects. Lower than expected production volumes also reduce the scale of any associated charging infrastructure rollout tied to Tesla's commercial vehicle ambitions.
Ionna to train dealership staff on EV charging at hundreds of US sites from Q1 2027
Ionna, the fast charging network backed by eight automakers including Toyota, Honda, GM, Hyundai, Kia, BMW, Mercedes-Benz and Stellantis, will launch a dealership training programme in the first quarter of 2027 targeting several hundred locations across Jacksonville, Orlando, Tampa, Dallas, San Francisco, San Jose and Raleigh. CEO Seth Cutler told Business Insider the network has grown from 90 active stations in January 2025 to 191 in early October, with 200 expected this month, though that remains far smaller than Tesla's 3,000 plus US sites.
Why it matters
The training push signals Ionna's strategy to address charging anxiety through dealer education rather than hardware alone, potentially influencing how OEM backed networks compete for highway and urban corridor contracts. For procurement teams, the programme flags which metro areas Ionna sees as expansion priorities through 2027.