Skip to content
EV Charging
Global

Mahle pairs automated parking with up to 11 kW inductive charging and is evaluating the technology with BMW

By Eve

Mahle presented a system on 26 November 2026 that combines automated parking with inductive charging of up to 11 kW, so a car can park and begin charging without a driver handling a cable. According to the French-language report, the vehicle camera and AI algorithms identify an equipped bay, then the DIPS positioning system aligns the car precisely over the charging plate before energy transfer starts automatically. Mahle says it is working with BMW to evaluate the technology, with home and fleet depot use cases cited.

Why it matters

Hands-free charging that depends on precise alignment shifts the specification burden to both the vehicle and the bay, which could affect depot and home charging procurement if the approach scales. At this stage it is an evaluation with BMW rather than a commercial rollout, so buyers should treat it as a development to monitor.

Source

Original title
[FR] “Fini les câbles de recharge : BMW expérimente une technologie qui pourrait tout changer”
Published
28 November 2026
Updated
29 November 2026
Also covered by
electrive.com

In this story

Place
Global
Tags
BMW · Mahle

Related news

BMW iX4 enters production in Hungary, with March 2027 launch and up to 828 km WLTP range planned

BMW began producing the iX4 electric coupé SUV at Debrecen, Hungary, in early November, and its press release of 20 November 2026 plans a launch in March 2027. The launch range starts with the 40 xDrive and 50 xDrive, with an M60 to follow. The 50 xDrive claims the longest range, up to 828 km WLTP, and BMW attributes charging of up to 400 kW to a different version from the one quoted at 638 km. The French report stresses that production start is not commercial launch, and that open orders or deliveries in France are not confirmed.

Why it matters

A 400 kW charging claim applies to specific versions rather than the whole range, so CPOs sizing high power hardware should not assume every iX4 will draw that power. Production has started but the market launch is still some months away, so demand from these vehicles will only start to appear on networks after March 2027.

Global
29 Nov 2026

BMW · Source

Guide for non-Tesla drivers on checking Tesla Superchargers before a stop in France and Europe

A French-language practical guide advises drivers of other brands to check, station by station in the Tesla app under "Rechargez votre VE", whether a Supercharger is open to non-Tesla vehicles, since a Tesla logo or a nearby open site is not proof of access. It notes that, according to Tesla, most Superchargers run 24 hours a day but some have limited hours, and that entry details such as gates or car park levels should be checked, as neighbouring shop hours do not necessarily apply to the chargers. The excerpt is cut off before the guide covers real-time availability, plugging in, payment and vacating the bay.

Why it matters

Open access at Tesla sites is decided site by site, so route planning and driver guidance for fleets and CPOs cannot assume a Tesla pin means a usable charger. Clear access, hours and entry information remains a differentiator for reliability, whether you operate sites or compete with them.

France
29 Nov 2026

Tesla · Source

India's Ministry of Heavy Industries defers national rollout of Unified Bharat e-Charge after weak pilot results

The Ministry of Heavy Industries will not expand Unified Bharat e-Charge nationally until issues found in pilot testing are resolved, according to businessline. Around 12 charging network operators are onboarded, but the platform remains limited to five pilot regions (Maharashtra, Karnataka, Delhi-NCR, Haryana and Rajasthan) nearly four months after launch, with access restricted to the BHIM app. Between 3 and 13 September, only nine of 148 transaction attempts led to completed charging sessions, a 6.1 per cent completion rate.

Why it matters

A national interoperable payment layer is not yet available to India's CPOs, so expansion timelines remain uncertain. Operators cited non-functional chargers, incompatible connectors, power cuts and difficulty identifying charging guns as the causes, which suggests site reliability and hardware readiness will decide whether CPOs benefit once the platform scales.

India
29 Nov 2026

MHI · Bharat e-Charge · Source