Skip to content
EV Charging
United States

GM and PG&E launch managed charging incentive with free home chargers and monthly bill credits

By Eve

Pacific Gas and Electric and GM Energy are offering PG&E customers who buy or lease a new Chevrolet, GMC or Cadillac EV a Smart Charge Bundle that includes a free GM Energy PowerShift or PowerUp 2 home charger and $15 monthly bill credits after installation. Through PG&E's EV Charge Manager program, participants can save up to an additional $50 per month by shifting charging to lower cost periods, with WeaveGrid providing grid orchestration software. The programme was announced in October 2026 in Charged EVs.

Why it matters

This utility and OEM partnership model demonstrates how managed charging programmes can be bundled with vehicle sales to drive grid friendly charging adoption. The combination of free hardware and ongoing bill credits creates a procurement template for utilities seeking to scale demand response programmes through automotive retail channels.

Source

Original title
“GM and PG&E offer an incentive package for managed EV charging program”
Published
8 October 2026
Updated
9 October 2026

Related news

GM US EV sales fall 62% year on year to 25,473 units in Q3 2026 after federal tax credit ended

General Motors delivered 25,473 all electric vehicles in the United States in Q3 2026, down 62% from 66,501 units in Q3 2025, according to the company's latest quarterly report. The sharp decline follows the end of the $7,500 federal tax credit in Q3 2025, which had driven record sales in that period. The Q3 2026 figures provide a 12 month view of the market impact since the incentive was withdrawn.

Why it matters

The collapse in GM EV volumes after the tax credit lapsed signals weaker near term demand for public and workplace charging infrastructure tied to these models. Fleet and site host procurement decisions may need to account for lower utilisation if OEM sales remain subdued without federal purchase incentives.

United States
10 Oct 2026

General Motors · Source

Electrify America operates 6,029 DC fast-charging ports across 1,191 US sites

Electrify America now runs 6,029 DC fast-charging ports at 1,191 locations in the United States, making it the second largest DC charging network after Tesla Supercharger, according to InsideEVs citing the US Department of Energy's Alternative Fuels Data Center. Over the past year, the network's port count grew by 16% and station count by around 10%, with 202 ports added in the second quarter alone, representing 6.7% of all US DC fast-charging ports. ChargePoint, the third largest operator, installed 333 ports in the same quarter and holds 6.1% market share, while Walmart's network added more ports than any other non-Tesla company in the quarter, reaching 916 ports across 110 stations.

Why it matters

The figures confirm Electrify America's dominant position among non-Tesla networks and provide procurement teams with current scale benchmarks for the US fast-charging market. Walmart's aggressive second quarter rollout signals a major retail-led expansion that could reshape site partnership opportunities for CPOs and equipment suppliers.

United States
12 Oct 2026

Electrify America · Source

Queue and reservation hardware shifts from niche to core layer as high utilisation sites hit capacity limits

The global market for public EV charging queue and reservation hardware is entering structural expansion as charge point operators face physical limits at high utilisation sites, according to an IndexBox report entering 2026. Demand is splitting between integrated systems for new high power hubs and retrofit solutions for existing stations. The hardware includes integrated displays, sensors, payment terminals, communication modules and access controllers, with supply chains characterised by validation requirements where approved vendor status with major CPOs and Tier 1 integrators often matters more than unit cost.

Why it matters

CPOs planning procurement must now evaluate queue management as core infrastructure rather than optional add on, with vendor selection increasingly driven by validation and integration partnerships rather than price alone. The bifurcation between new build and retrofit creates distinct channel and specification strategies for operators upgrading networks.

Global
12 Oct 2026

Source