Greater Manchester plans 200 bus depot in Stockport for 2029 opening
By Eve
Transport for Greater Manchester has unveiled plans for a purpose built electric bus depot on Heathside Park Road in Stockport, designed to house around 200 electric buses with charging infrastructure and maintenance facilities. Construction is scheduled to begin in 2027, with the depot operational by late 2029, replacing the existing Daw Bank site. The announcement follows confirmation of 125 additional electric Bee Network buses last month, part of Greater Manchester's target to achieve a fully electric fleet by 2030.
Why it matters: The 200 bus depot represents a significant charging and maintenance infrastructure procurement opportunity ahead of the 2027 construction start, with half of Greater Manchester's depots already electrified. The project signals sustained demand for depot scale charging solutions as UK cities accelerate zero emission bus rollouts, with London recently surpassing 3,000 zero emission buses toward its 2034 target.

