GRIDSERVE opens fifth Electric Forecourt at M1 Junction 29A with 39 ultra-rapid bays up to 400kW
By Eve
GRIDSERVE has launched its most advanced Electric Forecourt at Markham Vale near Junction 29A of the M1, featuring 39 ultra-rapid charging bays equipped with ABB hardware capable of delivering up to 400kW. The site includes 36 bays for passenger EVs, three drive-through bays for larger vehicles such as electric trucks and coaches, and three accessible bays, with compatible next-generation vehicles able to add more than 200 miles of range in under 10 minutes. This is GRIDSERVE's fifth Electric Forecourt and is described as one of Europe's most powerful public charging facilities.
Why it matters
The deployment of 39 high-power chargers at a strategic M1 location signals continued investment in ultra-rapid infrastructure to serve both private and commercial fleets. Procurement teams and CPOs will note the use of ABB's latest 400kW hardware and the site's capacity to accommodate HGVs and coaches, reflecting growing demand for depot-scale public charging.
Source
- Original title
- “GRIDSERVE Opens Its Most Advanced Electric Forecourt Yet at Markham Vale”
- Published
- 22 July 2026
- Also covered by
- electriccarsreport.com
In this story
- Topic
- EV Charging
- Place
- United Kingdom
- Tag
- GRIDSERVE
Related news
Shell Card adds Source ultra-rapid hubs to UK roaming network
Shell Fleet Solutions has integrated Source's UK ultra-rapid charging hubs into the Shell Card roaming network, giving fleet customers access to sites featuring at least 150kW chargers. Source operates more than half a dozen roaming partnerships and plans to open 300 ultra-rapid hubs across the UK and Ireland by 2030, all targeting 99% uptime and powered by renewable energy. Shell Card already provides access to over 72,000 public charge points across the UK.
Why it matters
The deal expands procurement options for fleet operators using Shell Card while reinforcing the commercial case for Source's hub rollout through guaranteed fleet demand. For CPOs, the partnership highlights how roaming agreements with major fuel card networks can accelerate utilisation at new ultra-rapid sites.
Source · Shell Card · Source
Brighton and Hove switches 500 on-street chargepoints to Believ and Char.gy, cuts tariffs
Brighton and Hove City Council is transferring 500 existing on-street chargepoints from Blink Charging UK to Believ and Char.gy from 15 October, bringing lower rates for overnight standard charging and all fast and rapid sessions. The council has installed 500 new chargepoints since March, plans a further 600 in the next six months, and will begin deploying 50 new rapid chargers in October. A separate trial will test pavement gullies for 200 households to run home charging cables.
Why it matters
The operator handover shows councils actively re-tendering to improve pricing and service for residents, while the 1,100 unit pipeline and 50 rapid rollout signal sustained capital deployment. Procurement teams and CPOs should note the shift toward dual-operator models and the emerging interest in kerb-side cable infrastructure as councils seek to close the home-charging gap.
Public EV charging now 16p per mile versus 19p for petrol as savings gap widens to 12 per cent
ChargeUK analysis shows public EV charging costs 16 pence per mile compared to 19 pence for petrol, creating a 12 per cent gap and annual savings of £152 for drivers covering 7,100 miles. Petrol and diesel prices swung 33 per cent and 42 per cent respectively in 2026, while public and home EV charging remained stable. The findings emerge as government reviews the Zero Emission Vehicle mandate, with ChargeUK warning that extreme reductions in EV sales quotas could result in over three million fewer EVs by 2030.
Why it matters
The stable pricing of public charging infrastructure against volatile fuel costs strengthens the commercial case for charge point operators and may influence procurement decisions as fleet operators seek predictable energy budgets. Government policy changes to the ZEV mandate could directly affect the scale of charging infrastructure investment required over the next five years.