Skip to content
EV Charging
United States

Illinois retiree couple charge new Hyundai Ioniq 5 only once in two months, paying $13

By Eve

A retired couple who moved to a walkable Chicago area city took delivery of an Ioniq 5 in August and waited two months before their first charge, according to a Reddit post reported by Electrek and republished by The Cool Down. The session took under 30 minutes, cost $13 to reach 80% and worked out at roughly $6.50 per month. Electrek also cited an AAA national survey finding the average US driver travels fewer than 29 miles a day.

Why it matters

The anecdote illustrates a very low usage profile, where a home or public charge point would see infrequent, short sessions from some low mileage drivers. For CPOs and procurement teams, it is a reminder that utilisation and revenue per driver vary widely, though this is a single self-reported case rather than market data.

Source

Original title
“Illinois retirees go 2 months before charging their new EV — and pay just $13”
Published
28 November 2026
Updated
29 November 2026

In this story

Related news

Guide for non-Tesla drivers on checking Tesla Superchargers before a stop in France and Europe

A French-language practical guide advises drivers of other brands to check, station by station in the Tesla app under "Rechargez votre VE", whether a Supercharger is open to non-Tesla vehicles, since a Tesla logo or a nearby open site is not proof of access. It notes that, according to Tesla, most Superchargers run 24 hours a day but some have limited hours, and that entry details such as gates or car park levels should be checked, as neighbouring shop hours do not necessarily apply to the chargers. The excerpt is cut off before the guide covers real-time availability, plugging in, payment and vacating the bay.

Why it matters

Open access at Tesla sites is decided site by site, so route planning and driver guidance for fleets and CPOs cannot assume a Tesla pin means a usable charger. Clear access, hours and entry information remains a differentiator for reliability, whether you operate sites or compete with them.

France
29 Nov 2026

Tesla · Source

India's Ministry of Heavy Industries defers national rollout of Unified Bharat e-Charge after weak pilot results

The Ministry of Heavy Industries will not expand Unified Bharat e-Charge nationally until issues found in pilot testing are resolved, according to businessline. Around 12 charging network operators are onboarded, but the platform remains limited to five pilot regions (Maharashtra, Karnataka, Delhi-NCR, Haryana and Rajasthan) nearly four months after launch, with access restricted to the BHIM app. Between 3 and 13 September, only nine of 148 transaction attempts led to completed charging sessions, a 6.1 per cent completion rate.

Why it matters

A national interoperable payment layer is not yet available to India's CPOs, so expansion timelines remain uncertain. Operators cited non-functional chargers, incompatible connectors, power cuts and difficulty identifying charging guns as the causes, which suggests site reliability and hardware readiness will decide whether CPOs benefit once the platform scales.

India
29 Nov 2026

MHI · Bharat e-Charge · Source

Lucid patent describes DC linked charging station that lets EVs share power

CarBuzz has found a Lucid patent for a "bi-directional vehicle-to-everything power sharing architecture", in which every plug on a charging station is linked on the DC side. This would let vehicles share power without extra conversion hardware or the losses of converting to AC and back. The system could prioritise one car over another, giving it all the power it can accept, and in some situations draw power from a non-priority car to charge the priority car faster, as well as charge more efficiently from solar or stationary battery storage.

Why it matters

A shared DC architecture could change how sites are specified, as it targets the current problem of multiple plugs competing for a single power supply, for example a 100 kW station serving two cars that can each accept 100 kW. It is only a patent, so buyers should treat it as a signal of where charger design may head rather than a product they can procure today.

United States
29 Nov 2026

Lucid · Source