Skip to content
EV Charging
United States

Ionna halves DC fast charging price to $0.20/kWh across US network for Thanksgiving weekend

By Eve

Ionna, the automaker-backed public charging network ranked first in J.D. Power's latest public charging satisfaction survey, has cut its average price from $0.40/kWh to $0.20/kWh plus tax at all its US DC fast charging stations, a 50% discount. The fixed price runs through November 29 and needs no code or special action, with payment via the automaker app, on-site terminals or the Presto app for Tesla owners using Autocharge. The report notes a 50 kWh session that would cost $20 now costs $10 plus tax, and that Ionna uses 400 kW Alpitronic chargers exclusively, with many stalls offering dual cords with CCS2 and NACS connectors.

Why it matters

A network-wide, time-limited price cut at a satisfaction-ranked operator shows how a well-funded CPO can use pricing to drive utilisation and brand loyalty during peak travel periods. Competing operators and site hosts should consider how it affects driver price expectations and the pricing assumptions in their own tenders and business cases.

Source

Original title
“Ionna Slashes EV Charging Prices For Thanksgiving”
Published
26 November 2026
Also covered by
evchargingstations.com · and more via Google News (1, 2)

In this story

Related news

IONNA, the eight automaker charging joint venture, positions 400kW chargers against Tesla Supercharger at LA Auto Show

In an interview at the LA Auto Show on 19 November, IONNA CEO Seth Cutler said the network aims to be trusted, reasonably priced and convenient for every EV driver. IONNA, founded in 2023 by Hyundai, Kia, BMW, GM, Honda, Mercedes-Benz, Stellantis and Toyota, supports outputs of up to 400kW, which the report says is 60% above Tesla's V3 Supercharger (250kW) and 14% above Electrify America and EVgo (350kW). A Hyundai Ioniq 5 is cited as charging from 10% to 80% in about 20 minutes.

Why it matters

An automaker-backed network pairing higher power ratings with price competitiveness and rapid roll-out raises the benchmark for rival CPOs and for site hosts weighing hardware and partner choices. Procurement teams should expect 400kW to feature more often in tender specifications and competitor comparisons.

United States
25 Nov 2026

IONNA · Source

MAHLE introduces Park & Charge pilot combining autonomous parking with wireless EV charging up to 11 kW

MAHLE has introduced a Park & Charge pilot for automakers that pairs autonomous parking with contact-free inductive charging. Vehicle cameras and AI-based algorithms identify compatible charging bays without extra sensors, and the Differential Inductive Positioning System (DIPS), which SAE International declared a global industry standard two years ago, aligns the vehicle over the ground pad. The system supports charging up to 11 kW at more than 92 percent efficiency under real-world vehicle conditions, includes bidirectional capability, and is being evaluated with the BMW Group in a BMW iX3, with a converted engine test cell in Stuttgart serving as the wireless charging test bench.

Why it matters

MAHLE names car rental, logistics and delivery fleets as target users, so depot operators and CPOs may need to consider ground pad infrastructure and automated bay alignment in future site designs. It is still a pilot with an OEM evaluation, so near-term procurement impact is limited, but it signals where hands-free fleet charging may head.

Global
26 Nov 2026

MAHLE (global) · Source

Urven unveils Urven Charger Park, a solar carport with EV charging that needs no conventional construction

Spanish start-up Urven, working with Bexie Energy, has launched Urven Charger Park, a modular system combining a solar carport with EV charging. It is self-supporting and uses prefabricated concrete ballast blocks instead of reinforced concrete foundations, with the two structures shown using bases of 2,500 kg and 3,500 kg. Parts are prepared in the factory so no cutting or drilling is needed on site, though fixing points are still required to meet local building regulations. The system was shown at the Genera trade fair in Madrid and is built on Urven's L Series solar carport range, as reported by a Turkish technology outlet.

Why it matters

Removing foundation works could shorten installation time and lower civil engineering cost and risk on car park sites, which is relevant to rollout speed and site selection. Buyers should still check the required fixing points and local building rules, as the report gives no pricing, charger power ratings or delivery timelines.

Turkey
26 Nov 2026

Donanım Haber (tr) · Source