Skip to content
EV Charging
Canada

Kempower wins framework deal to supply DC fast chargers across DP World's Canadian port terminals

By Eve

Finnish EVSE maker Kempower has signed a framework agreement with global logistics operator DP World to provide charging infrastructure and services at all DP World terminals in Canada. The first phase covers 46 Kempower satellites delivering 4.4 megawatts across the Vancouver, Fraser Surrey and Prince Rupert sites, supporting electrification of service vehicles and container handling equipment. DP World operates five Canadian terminals today, with a sixth under construction at Montreal's Contrecoeur site due for commissioning by 2030.

Why it matters

The multi site framework standardises charging hardware for one of the world's largest port operators in Canada, signalling fleet electrification at scale in heavy duty logistics. Kempower's existing 2024 deployment at DP World's London Gateway hub likely informed the Canadian rollout, offering a repeatable template for port electrification procurement.

Source

Original title
“Kempower to provide DC fast charging infrastructure to DP World’s port operations in Canada”
Published
13 September 2026
Updated
14 September 2026
Also covered by
chargedevs.com

In this story

Related news

Solar powered EV charging in Andhra Pradesh still at an early stage despite favourable conditions

A report on Nellore says Andhra Pradesh has abundant sunshine, a growing renewable energy ecosystem and rising interest in electric mobility, but solar powered charging remains nascent. Stations use rooftop or ground mounted solar panels with Battery Energy Storage Systems (BESS) to smooth fluctuations, drawing from the grid only when necessary. The article notes that public charging infrastructure in the state remains sporadic despite growing EV sales and strong government backing, and that Convergence Energy Services Ltd. (CESL), a subsidiary of Energy Efficiency Services Ltd. (EESL), was the first to deploy an integrated solar powered charging station in India.

Why it matters

Lower electricity costs at solar and BESS equipped sites could let charge point operators pass savings on to drivers, which makes Andhra Pradesh a potential market for integrated solar plus storage charging projects. The patchy public network, particularly for intercity travel, points to unmet demand for developers and funders.

India
31 Oct 2026

Source

Los Alamos County to open new DC fast charging stations at Mesa Public Library with ribbon cutting on 2 November

Los Alamos County has invited the community to a ribbon cutting ceremony on 2 November marking the opening of new Direct Current (DC) fast charging stations in the Mesa Public Library parking lot. The project was funded in part by the New Mexico Department of Transportation (NMDOT). County Sustainability Manager Angelica V. Gurule described the stations as a step toward expanding public EV charging infrastructure and supporting more sustainable transport in the community.

Why it matters

This is another example of state transport funding supporting municipal DC fast charging at public civic sites, a route that can open opportunities for CPOs and installers working with local authorities. The announcement gives no figures on charger count, power output or funding value, so those details would need to be confirmed directly.

United States
30 Oct 2026

Source

InstaVolt agrees national framework with Whitbread to bring ultra-rapid charging to Premier Inn sites

InstaVolt has agreed a national framework with Whitbread PLC, owner of Premier Inn, to build a pipeline of new ultra-rapid charging at well-located Premier Inn sites across the UK. Premier Inn has more than 845 hotels across the UK and Ireland. Earlier this year InstaVolt agreed to acquire 228 GeniePoint locations from Equans, comprising more than 260 chargers, including more than 100 locations associated with the Whitbread estate, and it plans to upgrade existing charging at Premier Inn sites with ultra-rapid hardware, enhanced grid connections where required and improved signage.

Why it matters

A national framework with the UK's largest hotel brand shows how a CPO can secure a repeatable host-site pipeline rather than negotiating site by site, building on an acquired footprint. Competing operators and landlords should note the pairing of hospitality dwell time with ultra-rapid upgrades of inherited charging assets.

United Kingdom
30 Oct 2026

Instavolt · Premier Inn · Source