T&E warns the Industrial Accelerator Act could lose its battery focus after the French and German carmaker deal
By Eve
Transport & Environment says the Industrial Accelerator Act (IAA) introduces Union content incentives so that scarce public subsidies and corporate tax incentives support European manufacturing, but proposals before the legislators risk undermining that aim. It says the French and German automotive deal of 16 October 2026 suggests battery sourcing requirements for eligible vehicles of 10% in 2028 to 2029, 20% in 2030 to 2031 and 70% from 2032, which it calls far below what the market already does. T&E argues that only a calibrated timeline, robust battery requirements and a strict geographical scope will secure the demand needed for announced capacity to materialise.
Why it matters
Union content rules tied to subsidies and tax incentives could shape which vehicles and battery supply chains qualify for support, and so the long term mix of European and Chinese supply behind electrification. Procurement teams and CPOs should watch how the final battery criteria and timeline are set, as they may influence sourcing and supplier risk.
Source
- Original title
- “Last Chance to Get It Right: The Industrial Accelerator Act Will Make or Break Europe’s Battery Industry”
- Published
- 19 November 2026
- Updated
- 20 November 2026
In this story
- Topic
- Policy & Market
- Place
- European Union
Related news
IEA warns UK pay-per-mile plans on top of existing motoring taxes could discourage the switch to cleaner vehicles
A new Institute of Economic Affairs report by Professor David Bailey of Birmingham Business School, Reforming Road Tax: The Case for a Fair, Sustainable Pay-per-Mile System in the UK, calls adding mileage charges on top of current motoring taxes the "most politically damaging design" for road pricing. From April 2028 the Government plans to charge electric car drivers 3p per mile and plug-in hybrid drivers 1.5p per mile, both on top of Vehicle Excise Duty, meaning £360 a year at 12,000 miles and £600 at 20,000 miles for an electric car. The IEA calculates that a plug-in hybrid driver covering 20,000 miles would pay £300 in mileage charges, plus £200 standard VED and a £440 Expensive Car Supplement for cars listed above £40,000, reaching £940 a year before fuel duty.
Why it matters
A new per-mile cost for electric and plug-in hybrid drivers could weaken the running cost case for switching, which feeds through to charger demand and utilisation assumptions in site business cases. CPOs and funders should watch how the April 2028 charge develops, as it may influence driver behaviour and the pace of electric vehicle uptake.
Indian Centre open to additional funding for EV charging infrastructure if needed, says PM adviser
A news headline reports that the Centre is open to extra funding for EV charging infrastructure if required, according to an adviser to the Prime Minister. A related headline on the same page says Kumaraswamy called for a reliable EV charging network, stressing uptime and easy payments. The excerpt gives no funding amounts, timelines or scheme details, and the surrounding items are Indian energy stories, not UK ones.
Why it matters
Any additional public funding is conditional and unquantified for now, so it is a signal to watch rather than a basis for bids. The stress on uptime and easy payments suggests that reliability and user experience could shape future support and procurement expectations in India.
India open to more EV charging funds once current allocation is exhausted, says PM adviser
Tarun Kapoor, adviser to Prime Minister Narendra Modi, said the government would consider a next phase of support if existing funds run out. He spoke on Friday at the SIAM National EV Charging Day, where the industry body held its first Growth and Readiness for EV Infrastructure Dialogue (GRID). Under PM E Drive, Rs 2,000 crore is earmarked for public charging, and as of September 28, 2026, Rs 851 crore had been approved for 8,147 chargers through three oil marketing companies and 10 states. Kapoor also urged power distribution companies to prepare.
Why it matters
Funding is not capped at the current Rs 2,000 crore, but more money depends on the existing allocation being used up, so approval and deployment pace will shape the next phase. CPOs and bidders should note that the subsidy can cover grid connections and charging equipment, with the level depending on location.