Skip to content
EV Charging
Netherlands

Dutch public chargepoints can now cut power or pause sessions to relieve local grid congestion

By Eve

ElaadNL announced on 12 November 2026 that participating public chargepoints in Flevopolder, Gelderland and Utrecht can reduce charging power, or temporarily pause a session, to ease pressure on the local electricity network. In its 11 November release, grid operator Stedin said it tells operators the day before where and when a reduction is needed, within windows of 6am to 11am and 3pm to 10pm, and that action depends on local congestion. Stedin says this control is possible on about 4,500 chargepoints in the province of Utrecht.

Why it matters

CPOs in the affected regions must be able to receive and act on day ahead grid instructions, and may need to explain slower or paused sessions to drivers. Buyers and bidders should expect remote power control and operator integration with the grid to become a practical requirement in hardware, software and site contracts.

Source

Original title
[FR] “Les Pays-Bas expérimentent une nouvelle façon de gérer la recharge électrique qui pourrait faire débat”
Published
14 November 2026
Updated
15 November 2026

In this story

Related news

Terawatt Infrastructure announces four new US fleet charging depots totalling 22MW

Terawatt Infrastructure has announced depots in South San Francisco, Nashville, Miami and Dallas with a combined capacity of 22MW. The San Francisco, Nashville and Dallas sites are near regional airports and supply 6.6MW, 4.5MW and 7MW respectively, while the Miami site in the Design District and Wynwood area is due to open this quarter and will provide a further 3.5MW. Terawatt developed and built all four, managed the utility connections and will operate them with its proprietary charge management software, and it has nearly 30 more depots in construction or development across the US.

Why it matters

Terawatt says it acquires, develops and operates sites as a turnkey service, rather than following the common 'powered land' model, which sets it apart for fleet operators weighing how much delivery risk to carry. Its pipeline of nearly 30 further depots, and its stated plan in June 2026 to borrow up to $300 million, particularly for the robotaxi sector, signal continued competition for fleet charging contracts and sites.

United States
16 Nov 2026

Terawatt · Source

French tenants seeking a parking space charger must choose between a collective or individual route

A guide for tenants in French apartment blocks says the route depends on the request. For a collective installation, Enedis tells tenants to approach their landlord first, who relays the request to the syndic (the building manager), who can gather residents' needs, seek proposals and put them to a general assembly. For an individual charger under the right to a socket, the syndic must also receive a copy of the tenant's notification. The article states the rules as applicable in France on 16 November 2026.

Why it matters

Tenant demand in French multi-occupancy buildings reaches projects through landlords and syndics, so early needs gathering and general assembly votes shape the pipeline. Tenants should also check for studies or votes already under way before ordering a unit, and installers and CPOs should engage those parties early.

France
16 Nov 2026

Source

Opinion piece says Kyrgyzstan's EV incentives have outpaced charging infrastructure, leaving apartment residents improvising

An opinion piece argues that Kyrgyzstan's green transition is paradoxical: state strategies, including the Renewable Energy Development Program for 2026 to 2030, and quotas to import electric vehicles promote EVs, while charging stations and technical and regulatory frameworks lag behind. It cites statistics showing Bishkek has 205,000 registered apartments against about 90,000 individual houses, a ratio of more than 2.2 to 1, so most residents cannot install a home charger in a garage or yard. The article illustrates the problem with an EV charged from a condo balcony via two joined extension cords hung from a tree, which it describes as a fire hazard.

Why it matters

Bishkek shows how import incentives without matching multi-dwelling charging provision push drivers towards unsafe workarounds, which points to unmet demand for shared and residential charging. For CPOs and funders, the housing mix and the regulatory gaps highlight where standards, safe installation rules and public or communal charging models would be needed.

Kyrgyzstan
16 Nov 2026

Source