MG Windsor EV facelift expected in India in 2027 with larger 61kWh battery
By Eve
MG Motor India is expected to launch a facelift of the Windsor EV in 2027, with a 61kWh battery pack, revised exterior and interior design, and a front-axle-mounted motor layout retained. The current Windsor, launched in 2024, is offered with 38kWh and 52.9kWh batteries with ARAI-claimed ranges of 332km and 449km, and it passed 80,000 cumulative sales in 2026. The claimed range, power and torque for the updated model have not been confirmed.
Why it matters
The Windsor is one of India's higher-volume electric passenger cars, so a larger battery in a model with this fleet footprint points to longer sessions and higher energy per charge at public sites. CPOs and site planners should treat this as an expected, unconfirmed update when forecasting demand in the segment.
Source
- Source
- https://www.autocarpro.in/news/mg-windsor-ev-facelift-expected-in-2027-with-longer-range-136067
- Original title
- “MG Windsor EV Facelift Expected in 2027 With Longer Range”
- Published
- 21 November 2026
- Updated
- 22 November 2026
In this story
- Topic
- Electric Vehicles
- Place
- India
- Tag
- MG
Related news
MG4 Urban 43 kWh Comfort tested over 3,000 km at €24,990, with 13.1 kWh/100 km average consumption
A French long-term test of the entry-level MG4 Urban 43 kWh Comfort, priced at €24,990, covered more than 3,000 km. Average consumption over 2,000 km was 13.1 kWh/100 km, giving a theoretical range of about 315 km against the manufacturer's claimed 325 km. MG claims 82 kW peak charging and 28 minutes for 10% to 80%, which the testers checked on a 300 kW charger with a preconditioned battery. The article also flags intrusive driver assistance and attention monitoring, and an awkwardly placed charging port.
Why it matters
A low-cost EV with a 43 kWh battery and claimed 82 kW peak charging points to a growing group of affordable cars that will not draw high power at ultra-rapid sites, which matters when planning charger power mix and dwell times. Real-world range near 315 km also shows how these smaller-battery cars may lean on public charging for longer trips. The charge port placement criticism is a reminder that bay layout and cable reach affect user experience.
Xpeng L03 electric SUV approved for sale in Australia in three variants
Xpeng's L03, its most affordable Australian-bound EV, has appeared on the ROVER approval-for-sale register in Standard Range RWD, Long Range RWD and AWD Performance variants. The SUV is 4.65 metres long and 1.6 metres tall, weighs 1.87 to 2.06 tonnes, and is approved to tow 1,500 kg braked or 750 kg unbraked. Battery details announced on the Gold Coast in September list LFP packs of 58.3 kWh for the Standard Range and 71.2 kWh for the Long Range and AWD, giving a WLTP range of 440 km to 520 km.
Why it matters
Another affordable Chinese EV with mid-sized LFP packs approved for Australia points to further growth in the local charging customer base from 2026. Operators planning sites and procurement should expect more vehicles in this battery size class using their chargers.
VinFast plans to build electric scooters in Tamil Nadu from the first half of 2027
VinFast plans to launch two electric scooter models in India in the first half of 2027, produced at its Thoothukudi facility in Tamil Nadu, where an electric two-wheeler line is already installed, according to company officials cited by PTI and reported by Moneycontrol. The scooters could include a battery-swapping option, and dealership partnerships across cities are being developed, with trials in the final stages. The group's V-GREEN arm is setting up charging stations and partnering with existing operators for two-wheeler and four-wheeler customers, and the group has said it plans to invest USD 2 billion in India across various sectors, including charging infrastructure.
Why it matters
A new entrant pairing local manufacturing with its own charging arm and operator partnerships could create openings for existing CPOs and hardware suppliers in India, particularly if battery swapping sits alongside plug-in charging for two-wheelers. Procurement teams should watch how V-GREEN chooses partners and which charging formats it prioritises.