Skip to content
EV Charging
United States
Michigan

Michigan resumes 60 station rollout after court forces release of $51 million federal EV charging grant

By Eve

Michigan's Department of Transportation will install 60 EV charging stations along major travel routes over the next three years, using $51 million from the National Electric Vehicle Infrastructure programme released last month following a federal court order. The Trump administration had withheld the funding for more than a year. The state remains far behind its 2030 target of 100,000 chargers, with drivers reporting difficulty finding available charging points even in major cities like Detroit and Chicago.

Why it matters

The funding release reopens procurement opportunities for charging infrastructure suppliers along Michigan's highway corridors, though the three year timeline and persistent gap to the 100,000 charger goal signal ongoing market uncertainty for CPOs planning long term network investments in the state.

Source

Original title
“Michigan revives EV charger expansion after federal funding reversal”
Published
19 June 2026 (date approximate)
Updated
22 September 2026

In this story

Related news

PPC blue and Cometex to install over 300 charging points across Romania with 20 MW capacity

PPC blue and Cometex have deployed 20 charging points to date across six Romanian cities, including an eight point, 450 kW hub at Aurora Retail Park in Giurgiu. The partnership will add more than 300 new charging points with an estimated total installed capacity exceeding 20 MW, including sites at Bricostore locations, while PPC blue will take over Cometex's existing network of more than 87 charging points at retail parks nationwide.

Why it matters

The rollout demonstrates a retail focused charging strategy targeting high footfall locations, with the network integration offering procurement teams a consolidated operator relationship across multiple Romanian retail sites. The 20 MW pipeline signals significant grid connection and equipment supply opportunities for contractors and hardware vendors in the Romanian market.

22 Oct 2026

PPC blue · Cometex · Source

Andersen EV launches Range Rover Collection home chargers in six configurations

Andersen EV has introduced the Andersen Range Rover Collection of home chargers, comprising six configurations for the Andersen Quartz and A3 models, inspired by the Range Rover Electric and Range Rover Sport Electric. The collection features three palettes based on Range Rover exterior colours, including the Blackthorn collection inspired by Santorini Black paint. Each charger is made to order at Andersen's Bedfordshire facility, with in house development, production quality control and dedicated customer care.

Why it matters

The partnership between Andersen EV and Range Rover signals growing collaboration between premium automotive and charging brands to offer integrated home charging solutions. For CPOs and installers, branded charger collections tied to specific vehicle models may open new sales channels through dealership networks and affluent homeowner segments.

United Kingdom
22 Oct 2026

Andersen EV (uk) · Range Rover (uk) · Source

Seattle opens applications for 200 curbside Level 2 chargers targeting apartment areas by 2030

Seattle City Light is accepting resident applications for up to 200 new curbside Level 2 EV chargers to be installed from fall 2027 through 2030, prioritising multifamily housing areas with limited existing charging. The city will review applications and select locations in batches of 40 to 50 sites, with design and permitting starting spring 2027 and each site requiring approximately two weeks of construction. Seattle already operates 58 chargers from an earlier pilot programme.

Why it matters

The resident led application process and phased procurement model offers a replicable framework for cities targeting underserved multifamily housing, with clear timelines for design, permitting and installation that CPOs and contractors can plan around. The batch selection approach creates predictable tender windows for equipment suppliers and installation firms through to 2030.

United States
22 Oct 2026

Source