Skip to content
EV Charging
United Kingdom

Moray Council approves cross-pavement EV charging policy for residents without driveways

By Eve

Moray Council's Economic Development and Infrastructure Services committee has approved a policy allowing residents without off-street parking to install charging cables beneath public footways, making it one of the first Scottish councils to do so. Residents must apply for permission via a Section 109 Agreement at a cost of £923, covering application processing, legal agreements and site inspections, though Energy Savings Trust grant funding may be available for eligible applicants. The policy aims to expand home charging access while preventing safety risks from cables laid across pavements.

Why it matters

The policy creates a replicable framework for local authorities seeking to expand residential charging infrastructure beyond properties with driveways, addressing a key barrier to EV adoption in urban and terraced housing areas. The £923 permit fee and Section 109 legal structure offer procurement teams and charge point operators a clear cost and compliance model for similar cross-pavement installations across Scotland and potentially the wider UK.

Source

Original title
“Moray Council to support home EV charging for residents without driveways”
Published
8 September 2026

In this story

Related news

Solar powered EV charging in Andhra Pradesh still at an early stage despite favourable conditions

A report on Nellore says Andhra Pradesh has abundant sunshine, a growing renewable energy ecosystem and rising interest in electric mobility, but solar powered charging remains nascent. Stations use rooftop or ground mounted solar panels with Battery Energy Storage Systems (BESS) to smooth fluctuations, drawing from the grid only when necessary. The article notes that public charging infrastructure in the state remains sporadic despite growing EV sales and strong government backing, and that Convergence Energy Services Ltd. (CESL), a subsidiary of Energy Efficiency Services Ltd. (EESL), was the first to deploy an integrated solar powered charging station in India.

Why it matters

Lower electricity costs at solar and BESS equipped sites could let charge point operators pass savings on to drivers, which makes Andhra Pradesh a potential market for integrated solar plus storage charging projects. The patchy public network, particularly for intercity travel, points to unmet demand for developers and funders.

India
31 Oct 2026

Source

Los Alamos County to open new DC fast charging stations at Mesa Public Library with ribbon cutting on 2 November

Los Alamos County has invited the community to a ribbon cutting ceremony on 2 November marking the opening of new Direct Current (DC) fast charging stations in the Mesa Public Library parking lot. The project was funded in part by the New Mexico Department of Transportation (NMDOT). County Sustainability Manager Angelica V. Gurule described the stations as a step toward expanding public EV charging infrastructure and supporting more sustainable transport in the community.

Why it matters

This is another example of state transport funding supporting municipal DC fast charging at public civic sites, a route that can open opportunities for CPOs and installers working with local authorities. The announcement gives no figures on charger count, power output or funding value, so those details would need to be confirmed directly.

United States
30 Oct 2026

Source

InstaVolt agrees national framework with Whitbread to bring ultra-rapid charging to Premier Inn sites

InstaVolt has agreed a national framework with Whitbread PLC, owner of Premier Inn, to build a pipeline of new ultra-rapid charging at well-located Premier Inn sites across the UK. Premier Inn has more than 845 hotels across the UK and Ireland. Earlier this year InstaVolt agreed to acquire 228 GeniePoint locations from Equans, comprising more than 260 chargers, including more than 100 locations associated with the Whitbread estate, and it plans to upgrade existing charging at Premier Inn sites with ultra-rapid hardware, enhanced grid connections where required and improved signage.

Why it matters

A national framework with the UK's largest hotel brand shows how a CPO can secure a repeatable host-site pipeline rather than negotiating site by site, building on an acquired footprint. Competing operators and landlords should note the pairing of hospitality dwell time with ultra-rapid upgrades of inherited charging assets.

United Kingdom
30 Oct 2026

Instavolt · Premier Inn · Source