Skip to content
EV Charging
United Kingdom

TLB Development submits plans for 16-bay ultra-rapid charging hub and car wash at Highbridge business park

By Eve

TLB Development has lodged a planning application with Somerset Council for a 16-chargepoint electric vehicle hub offering 150kW+ ultra-rapid charging alongside a self-serve car wash at Oaktree Business Park in Highbridge. The site, located next to the McDonald's drive-thru and accessed via the existing business park spine road, would feature CCS2-compatible chargers supported by new substations, electrical cabinets and lighting. Pre-application advice from Somerset Council indicates the land, allocated for employment use under the Sedgemoor Local Plan and Isleport 2 Business Park SPD, is suitable for this complementary commercial development.

Why it matters

The proposal adds a significant ultra-rapid charging node to the A38 corridor between Burnham-On-Sea and M5 Junction 22, targeting high-footfall retail and motorway traffic. For charge point operators and contractors, the 16-bay scale and co-location with established food and fuel amenities signal a competitive tender opportunity in Somerset's employment land pipeline.

Source

Original title
“New self‑serve car wash and 16-vehicle electric charging station planned next to Highbridge McDonald’s”
Published
29 May 2026 (date approximate)
Updated
22 September 2026

In this story

Related news

PPC blue and Cometex to install over 300 charging points across Romania with 20 MW capacity

PPC blue and Cometex have deployed 20 charging points to date across six Romanian cities, including an eight point, 450 kW hub at Aurora Retail Park in Giurgiu. The partnership will add more than 300 new charging points with an estimated total installed capacity exceeding 20 MW, including sites at Bricostore locations, while PPC blue will take over Cometex's existing network of more than 87 charging points at retail parks nationwide.

Why it matters

The rollout demonstrates a retail focused charging strategy targeting high footfall locations, with the network integration offering procurement teams a consolidated operator relationship across multiple Romanian retail sites. The 20 MW pipeline signals significant grid connection and equipment supply opportunities for contractors and hardware vendors in the Romanian market.

22 Oct 2026

PPC blue · Cometex · Source

Andersen EV launches Range Rover Collection home chargers in six configurations

Andersen EV has introduced the Andersen Range Rover Collection of home chargers, comprising six configurations for the Andersen Quartz and A3 models, inspired by the Range Rover Electric and Range Rover Sport Electric. The collection features three palettes based on Range Rover exterior colours, including the Blackthorn collection inspired by Santorini Black paint. Each charger is made to order at Andersen's Bedfordshire facility, with in house development, production quality control and dedicated customer care.

Why it matters

The partnership between Andersen EV and Range Rover signals growing collaboration between premium automotive and charging brands to offer integrated home charging solutions. For CPOs and installers, branded charger collections tied to specific vehicle models may open new sales channels through dealership networks and affluent homeowner segments.

United Kingdom
22 Oct 2026

Andersen EV (uk) · Range Rover (uk) · Source

Seattle opens applications for 200 curbside Level 2 chargers targeting apartment areas by 2030

Seattle City Light is accepting resident applications for up to 200 new curbside Level 2 EV chargers to be installed from fall 2027 through 2030, prioritising multifamily housing areas with limited existing charging. The city will review applications and select locations in batches of 40 to 50 sites, with design and permitting starting spring 2027 and each site requiring approximately two weeks of construction. Seattle already operates 58 chargers from an earlier pilot programme.

Why it matters

The resident led application process and phased procurement model offers a replicable framework for cities targeting underserved multifamily housing, with clear timelines for design, permitting and installation that CPOs and contractors can plan around. The batch selection approach creates predictable tender windows for equipment suppliers and installation firms through to 2030.

United States
22 Oct 2026

Source