Nice converts 86 former Mobilize Share charging points to public network after car-sharing exit
By Eve
The Nice Côte d'Azur metropolitan region has opened 86 charging stations to the public following the discontinuation of Renault's Mobilize Share car-sharing service on 30 June 2026. The stations, previously reserved for Mobilize vehicles, have been integrated into the Prise de Nice network after a brief refurbishment. Of the 86 points, 80 are in Nice itself, expanding the city's public charging network by 20 per cent, with the remaining six distributed across Villefranche-sur-Mer, Carros, and Cagnes-sur-Mer.
Why it matters
The conversion demonstrates how municipalities can rapidly absorb stranded private charging assets to expand public networks, offering a procurement model for cities facing similar operator exits. The 20 per cent capacity boost in Nice shows the scale of infrastructure that can be unlocked when corporate mobility schemes are restructured.
Source
- Source
- https://www.electrive.com/2026/08/04/nice-opens-former-mobilize-share-charging-network-to-public/
- Original title
- “Nice opens former Mobilize Share charging network to public”
- Published
- 4 August 2026
- Updated
- 7 August 2026
- Also covered by
- automobile-propre.com · and more via Google News
In this story
- Topic
- EV Charging
- Place
- France
- Tags
- Nice · Mobilize Share
Related news
Electrify America operates 6,029 DC fast-charging ports across 1,191 US sites
Electrify America now runs 6,029 DC fast-charging ports at 1,191 locations in the United States, making it the second largest DC charging network after Tesla Supercharger, according to InsideEVs citing the US Department of Energy's Alternative Fuels Data Center. Over the past year, the network's port count grew by 16% and station count by around 10%, with 202 ports added in the second quarter alone, representing 6.7% of all US DC fast-charging ports. ChargePoint, the third largest operator, installed 333 ports in the same quarter and holds 6.1% market share, while Walmart's network added more ports than any other non-Tesla company in the quarter, reaching 916 ports across 110 stations.
Why it matters
The figures confirm Electrify America's dominant position among non-Tesla networks and provide procurement teams with current scale benchmarks for the US fast-charging market. Walmart's aggressive second quarter rollout signals a major retail-led expansion that could reshape site partnership opportunities for CPOs and equipment suppliers.
Queue and reservation hardware shifts from niche to core layer as high utilisation sites hit capacity limits
The global market for public EV charging queue and reservation hardware is entering structural expansion as charge point operators face physical limits at high utilisation sites, according to an IndexBox report entering 2026. Demand is splitting between integrated systems for new high power hubs and retrofit solutions for existing stations. The hardware includes integrated displays, sensors, payment terminals, communication modules and access controllers, with supply chains characterised by validation requirements where approved vendor status with major CPOs and Tier 1 integrators often matters more than unit cost.
Why it matters
CPOs planning procurement must now evaluate queue management as core infrastructure rather than optional add on, with vendor selection increasingly driven by validation and integration partnerships rather than price alone. The bifurcation between new build and retrofit creates distinct channel and specification strategies for operators upgrading networks.
E.ON acquires former BP Pulse EV charging network in the Netherlands from Catom
E.ON has bought the EV charging business from Dutch fuel distributor Catom, which had acquired BP's petrol station and charging operations in the country last year. The portfolio includes 17 fast charging hubs with Alpitronic chargers delivering up to 300kW, 51 battery buffered sites for grid constrained locations, and 45 secured development sites for future rollout. E.ON Infrastructure will own and maintain the assets while sister utility Essent will handle customer facing operations and marketing, with sites rebranded to Essent and chargers carrying E.ON branding.
Why it matters
The deal consolidates a ready built Dutch charging estate under a major European utility, giving E.ON immediate scale in a market where battery buffered sites address grid capacity constraints. The 45 secured development sites offer a clear pipeline for staged expansion, while the dual brand model separates infrastructure ownership from customer operations.