Skip to content
Grid & Energy
United States

North Carolina school rooftops could host 900 MW of solar capacity, report finds

By Eve

A report by Environment North Carolina Research & Policy Center and Frontier Group estimates that public school rooftops in North Carolina could accommodate more than 900 megawatts of solar capacity, generating 1.6 terawatt hours of electricity in the first year. That output would represent roughly 1.2% of the state's annual electricity use and could power nearly 150,000 typical homes per year, while also lowering school power bills and providing backup during severe weather.

Why it matters

The finding highlights a large, underutilised asset class for distributed solar deployment, with potential grid services and resilience benefits that could inform procurement strategies for school districts and utilities. It also signals a pipeline opportunity for installers and financiers targeting the education sector in North Carolina.

Source

Original title
“North Carolina schools could turn idle rooftops into savings, grid power, and storm backup”
Published
7 October 2026
Updated
8 October 2026

In this story

Related news

750 affordable homes in UK now heated by mine water geothermal network

A new energy centre at Seaham Garden Village in the UK is now supplying low carbon heat to around 750 affordable homes using naturally warm mine water pumped from a Durham treatment facility. Energy Live News reported that the network has completed commissioning and is fully operational. The system uses geothermal processes that keep mine water at a relatively constant temperature year round, providing a dependable heat source instead of traditional heating fuel.

Why it matters

The operational mine water heating network demonstrates a replicable model for decarbonising heat in social housing developments, potentially informing procurement specifications for low carbon heating infrastructure at scale. The proven reliability of geothermal mine water as a consistent year round heat source may influence future district heating tenders and public sector energy resilience planning.

United Kingdom
12 Oct 2026

Source

Tesla Powerwall autonomously grid-charged before peak rates to offset low solar yield in Arizona

A Tesla Powerwall owner in Tucson, Arizona, reported that the battery began charging from the grid at around 2:30 p.m. on a rainy day, ahead of a 3 to 7 p.m. peak rate window, after solar generation fell short. The homeowner had set the system to Saving mode and disabled Stormwatch, allowing the Powerwall to draw enough grid power to cover the high cost period. The case, shared on Reddit's r/Powerwall forum, illustrates how residential storage can automatically balance low renewable output with time of use tariffs.

Why it matters

The example shows demand side flexibility in action, with home batteries responding to tariff signals and weather conditions without manual intervention. For CPOs and utilities, it underscores the growing role of behind the meter storage in load shifting and the need for rate structures that reward or integrate such behaviour at scale.

United States
11 Oct 2026

Tesla · Source

Wound Type Current Transformer Market Forecast to 2035 Highlights EV Charging Infrastructure as Key Growth Driver

IndexBox's latest global market report identifies wound type current transformers as entering a decade of structurally higher demand through 2035, driven by electricity system digitalization, decarbonization and decentralization. Growth will be anchored in utility smart meter rollouts, renewable energy integration, EV charging infrastructure and industrial automation. The market is bifurcating between standardized catalog parts for high volume OEMs and customized, application engineered solutions for critical infrastructure.

Why it matters

For CPOs and charging network developers, the report signals that precision current measurement components essential for revenue grade metering and power quality monitoring in EV charging stations will see sustained supply and innovation through 2035. The bifurcation between standardized and custom solutions suggests procurement teams should assess whether catalog parts meet accuracy requirements or if critical sites warrant engineered transformer specifications.

Global
10 Oct 2026

Source