Skip to content
EV Charging
Global

Pionix to supply EVerest open-source software stack for Tritium DC fast chargers

By Eve

EV charging software firm Pionix will provide its EVerest open-source software stack to DC fast charging hardware manufacturer Tritium, with first chargers running the EVerest-based software on track for delivery to customers in summer 2026. EVerest offers a modular software architecture separating hardware drivers from application logic, with key charging protocols already implemented and tested, including OCPP compliance certification through other vendor integrations and Plug and Charge pre-certification as a stack through Hubject. Tritium is adopting EVerest to focus internal engineering on hardware development, field reliability and customer-specific integrations while building on an open-source software foundation for charging protocols and interoperability.

Why it matters

The partnership signals a shift in the DC fast charging supply chain, with hardware manufacturers outsourcing protocol software to open-source platforms, potentially accelerating interoperability and reducing certification timelines for CPOs procuring Tritium units. Pre-certified OCPP and Plug and Charge capabilities through EVerest may lower integration risk and speed deployment for fleet and public charging operators.

Source

Original title
“Pionix to provide its EVerest open-source software stack for Tritium’s EV chargers”
Published
28 May 2026 (date approximate)
Updated
22 September 2026

In this story

Related news

Believ to install more than 600 chargers across Ayrshire in 15 year council partnership

EV charge point operator Believ has secured a 15 year agreement with three Ayrshire councils to install more than 600 chargers at around 300 locations, with installation beginning in early 2027. The project combines over £2.8m from the Scottish Government's EV Infrastructure Fund with more than £15m in committed capital investment from Believ, delivered alongside Transport Scotland and the Scottish Futures Trust. The rollout includes roughly 180 chargers for East Ayrshire, 210 for North Ayrshire and 220 for South Ayrshire, with passive infrastructure for over 450 additional chargers to enable future upgrades without disruptive roadworks.

Why it matters

This major regional deployment demonstrates how CPOs can secure long term public sector contracts by combining government funding with substantial private capital, creating a scalable model for rural and island charging access. The inclusion of passive infrastructure for 450 additional chargers shows forward planning that reduces future deployment costs and speeds network expansion as EV adoption grows.

United Kingdom
9 Oct 2026

Believ · Source

Vietnam mandates cross-brand compatibility at public EV chargers from July 2027

Circular 61/2026/TT-BCT, issued by Vietnam's Ministry of Industry and Trade, requires public EV charging stations to serve vehicles from multiple manufacturers starting 1 July 2027. Operators must install compatible connectors, charging modes and technical specifications, and station control systems must not restrict charging for publicly declared compatible vehicle configurations. The regulation emphasises technical compatibility without mandating support for all vehicle brands, The Investor reported on 8 October.

Why it matters

The rule forces charging point operators in Vietnam to design infrastructure for interoperability, potentially raising upfront costs but widening the addressable customer base. Procurement teams and OEMs will need to verify that hardware and software meet the new compatibility standards ahead of the July 2027 deadline.

Vietnam
9 Oct 2026

Source

Tesla and Pilot deploy over a dozen Megacharger stations for Semi trucks across US freight corridors

Pilot Travel Centers and Tesla are building more than a dozen megawatt charging stations for Tesla Semi trucks along major US freight routes, with the first site already operational in Ellabell, Georgia. Each station will feature four to eight Megachargers capable of delivering up to 1.2 megawatts per stall, located at Pilot sites along I-5, I-10 and other corridors in California, Indiana, Nevada and Texas. The Ellabell station has six stalls, while a separate Tesla Semi station in Conley, Georgia, has also been energised this week.

Why it matters

This rollout demonstrates how CPOs can secure anchor tenancy by co-locating high power charging infrastructure at established commercial vehicle rest stops, reducing range anxiety for fleet operators. The partnership between North America's largest travel centre network and Tesla establishes a template for scaling heavy duty charging along predictable freight routes.

United States
9 Oct 2026

Tesla (us) · Source