PLN installs over 92,000 home chargers and 5,000 public stations across Indonesia by mid 2026
By Eve
Indonesia's state electricity company PT PLN reported 92,112 home chargers and 5,016 public charging stations installed by 30 June 2026, representing 800 times and 22 times growth respectively since 2021. The network also includes 1,133 battery swap stations and 619 motorcycle charging points, all integrated through the PLN Mobile app for location, management and transaction monitoring.
Why it matters
The scale and pace of PLN's rollout, particularly the near 800 fold increase in home installations, signals Indonesia's rapid shift to residential charging infrastructure and creates a reference case for state utility led EV programmes in emerging markets. Procurement teams and charge point operators entering Southeast Asia now face an incumbent with over 98,000 total charging assets and a unified digital platform.
Source
- Original title
- “PLN Expands EV Charging Network as Home Chargers Surpass 92,000”
- Published
- 24 July 2026
- Updated
- 26 July 2026
In this story
- Topic
- EV Charging
- Place
- Indonesia
- Tag
- PLN
Related news
Electrify America operates 6,029 DC fast-charging ports across 1,191 US sites
Electrify America now runs 6,029 DC fast-charging ports at 1,191 locations in the United States, making it the second largest DC charging network after Tesla Supercharger, according to InsideEVs citing the US Department of Energy's Alternative Fuels Data Center. Over the past year, the network's port count grew by 16% and station count by around 10%, with 202 ports added in the second quarter alone, representing 6.7% of all US DC fast-charging ports. ChargePoint, the third largest operator, installed 333 ports in the same quarter and holds 6.1% market share, while Walmart's network added more ports than any other non-Tesla company in the quarter, reaching 916 ports across 110 stations.
Why it matters
The figures confirm Electrify America's dominant position among non-Tesla networks and provide procurement teams with current scale benchmarks for the US fast-charging market. Walmart's aggressive second quarter rollout signals a major retail-led expansion that could reshape site partnership opportunities for CPOs and equipment suppliers.
Queue and reservation hardware shifts from niche to core layer as high utilisation sites hit capacity limits
The global market for public EV charging queue and reservation hardware is entering structural expansion as charge point operators face physical limits at high utilisation sites, according to an IndexBox report entering 2026. Demand is splitting between integrated systems for new high power hubs and retrofit solutions for existing stations. The hardware includes integrated displays, sensors, payment terminals, communication modules and access controllers, with supply chains characterised by validation requirements where approved vendor status with major CPOs and Tier 1 integrators often matters more than unit cost.
Why it matters
CPOs planning procurement must now evaluate queue management as core infrastructure rather than optional add on, with vendor selection increasingly driven by validation and integration partnerships rather than price alone. The bifurcation between new build and retrofit creates distinct channel and specification strategies for operators upgrading networks.
E.ON acquires former BP Pulse EV charging network in the Netherlands from Catom
E.ON has bought the EV charging business from Dutch fuel distributor Catom, which had acquired BP's petrol station and charging operations in the country last year. The portfolio includes 17 fast charging hubs with Alpitronic chargers delivering up to 300kW, 51 battery buffered sites for grid constrained locations, and 45 secured development sites for future rollout. E.ON Infrastructure will own and maintain the assets while sister utility Essent will handle customer facing operations and marketing, with sites rebranded to Essent and chargers carrying E.ON branding.
Why it matters
The deal consolidates a ready built Dutch charging estate under a major European utility, giving E.ON immediate scale in a market where battery buffered sites address grid capacity constraints. The 45 secured development sites offer a clear pipeline for staged expansion, while the dual brand model separates infrastructure ownership from customer operations.