Private firm builds off-grid solar fast-charging station in Guanabo, Havana
By Eve
5ta Avenida Motores S.U.R.L., which manages Dongfeng after-sales service in Cuba, is building a public fast-charging station in La Veneciana, just outside Guanabo, designed to run independently of the National Electric System. The site is planned to have a solar park of 432 photovoltaic panels (about 263.5 kWp), a one megawatt-hour storage system and five charging points, two at 60 kW and three at 7 kW, serving up to seven vehicles at once. The company announced the project on Facebook, and the report adds that the station will include an EV diagnostic centre and aims to offer 24-hour service, while 60 kW pilot tests are under way at its workshop in Playa.
Why it matters
This is a private, grid-independent solar and storage charging model in a market with constrained grid supply, and it pairs charging with after-sales and diagnostics. For CPOs and procurement teams, it is a reference point for off-grid hub sizing, with 263.5 kWp of solar and one megawatt-hour of storage behind 134 kW of charging capacity (two 60 kW and three 7 kW points).
Source
- Original title
- “Private Company Develops Solar-Powered Electric Vehicle Charging Station in Guanabo”
- Published
- 29 November 2026
In this story
- Topic
- EV Charging
- Place
- Cuba
Related news
Guide for non-Tesla drivers on checking Tesla Superchargers before a stop in France and Europe
A French-language practical guide advises drivers of other brands to check, station by station in the Tesla app under "Rechargez votre VE", whether a Supercharger is open to non-Tesla vehicles, since a Tesla logo or a nearby open site is not proof of access. It notes that, according to Tesla, most Superchargers run 24 hours a day but some have limited hours, and that entry details such as gates or car park levels should be checked, as neighbouring shop hours do not necessarily apply to the chargers. The excerpt is cut off before the guide covers real-time availability, plugging in, payment and vacating the bay.
Why it matters
Open access at Tesla sites is decided site by site, so route planning and driver guidance for fleets and CPOs cannot assume a Tesla pin means a usable charger. Clear access, hours and entry information remains a differentiator for reliability, whether you operate sites or compete with them.
India's Ministry of Heavy Industries defers national rollout of Unified Bharat e-Charge after weak pilot results
The Ministry of Heavy Industries will not expand Unified Bharat e-Charge nationally until issues found in pilot testing are resolved, according to businessline. Around 12 charging network operators are onboarded, but the platform remains limited to five pilot regions (Maharashtra, Karnataka, Delhi-NCR, Haryana and Rajasthan) nearly four months after launch, with access restricted to the BHIM app. Between 3 and 13 September, only nine of 148 transaction attempts led to completed charging sessions, a 6.1 per cent completion rate.
Why it matters
A national interoperable payment layer is not yet available to India's CPOs, so expansion timelines remain uncertain. Operators cited non-functional chargers, incompatible connectors, power cuts and difficulty identifying charging guns as the causes, which suggests site reliability and hardware readiness will decide whether CPOs benefit once the platform scales.
MHI · Bharat e-Charge · Source
Lucid patent describes DC linked charging station that lets EVs share power
CarBuzz has found a Lucid patent for a "bi-directional vehicle-to-everything power sharing architecture", in which every plug on a charging station is linked on the DC side. This would let vehicles share power without extra conversion hardware or the losses of converting to AC and back. The system could prioritise one car over another, giving it all the power it can accept, and in some situations draw power from a non-priority car to charge the priority car faster, as well as charge more efficiently from solar or stationary battery storage.
Why it matters
A shared DC architecture could change how sites are specified, as it targets the current problem of multiple plugs competing for a single power supply, for example a 100 kW station serving two cars that can each accept 100 kW. It is only a patent, so buyers should treat it as a signal of where charger design may head rather than a product they can procure today.