Daimler Truck extends TruckCharge semi-public depot charging network to 21 European countries
By Eve
Daimler Truck says its TruckCharge network, launched with pilot customers in late 2025, is now available in 21 European countries. Under the semi-public model, hauliers with their own chargers can offer spare capacity to other fleets, setting their own time slots, eligible users and pricing, and the network also includes dealer chargers and Daimler Truck sites such as the Mercedes-Benz plant in Wörth. The company targets more than 3,000 charge points in Europe by 2030, and since August 2026 the network has opened to public charging through Milence, giving customers access to around 300 points, according to French trade coverage.
Why it matters
Depot capacity that sits idle can become a revenue line for fleet owners, and it offers charge point operators a possible partner or competitor model alongside slow-building public truck charging. Procurement teams should note that access, scheduling and pricing are controlled by each host through the TruckCharge Connect portal, which affects how depot chargers are specified and managed.
Source
- Original title
- [FR] “Recharge des camions électriques : Daimler veut transformer les dépôts privés en bornes partagées”
- Published
- 28 November 2026
- Updated
- 29 November 2026
In this story
- Topic
- EV Charging
- Place
- Global
- Tag
- Daimler
Related news
Guide for non-Tesla drivers on checking Tesla Superchargers before a stop in France and Europe
A French-language practical guide advises drivers of other brands to check, station by station in the Tesla app under "Rechargez votre VE", whether a Supercharger is open to non-Tesla vehicles, since a Tesla logo or a nearby open site is not proof of access. It notes that, according to Tesla, most Superchargers run 24 hours a day but some have limited hours, and that entry details such as gates or car park levels should be checked, as neighbouring shop hours do not necessarily apply to the chargers. The excerpt is cut off before the guide covers real-time availability, plugging in, payment and vacating the bay.
Why it matters
Open access at Tesla sites is decided site by site, so route planning and driver guidance for fleets and CPOs cannot assume a Tesla pin means a usable charger. Clear access, hours and entry information remains a differentiator for reliability, whether you operate sites or compete with them.
India's Ministry of Heavy Industries defers national rollout of Unified Bharat e-Charge after weak pilot results
The Ministry of Heavy Industries will not expand Unified Bharat e-Charge nationally until issues found in pilot testing are resolved, according to businessline. Around 12 charging network operators are onboarded, but the platform remains limited to five pilot regions (Maharashtra, Karnataka, Delhi-NCR, Haryana and Rajasthan) nearly four months after launch, with access restricted to the BHIM app. Between 3 and 13 September, only nine of 148 transaction attempts led to completed charging sessions, a 6.1 per cent completion rate.
Why it matters
A national interoperable payment layer is not yet available to India's CPOs, so expansion timelines remain uncertain. Operators cited non-functional chargers, incompatible connectors, power cuts and difficulty identifying charging guns as the causes, which suggests site reliability and hardware readiness will decide whether CPOs benefit once the platform scales.
MHI · Bharat e-Charge · Source
Lucid patent describes DC linked charging station that lets EVs share power
CarBuzz has found a Lucid patent for a "bi-directional vehicle-to-everything power sharing architecture", in which every plug on a charging station is linked on the DC side. This would let vehicles share power without extra conversion hardware or the losses of converting to AC and back. The system could prioritise one car over another, giving it all the power it can accept, and in some situations draw power from a non-priority car to charge the priority car faster, as well as charge more efficiently from solar or stationary battery storage.
Why it matters
A shared DC architecture could change how sites are specified, as it targets the current problem of multiple plugs competing for a single power supply, for example a 100 kW station serving two cars that can each accept 100 kW. It is only a patent, so buyers should treat it as a signal of where charger design may head rather than a product they can procure today.