Skip to content
EV Charging
India

RIOD Logic opens EV charger manufacturing subsidiary at Nedumbassery and launches dynamic UPI payments

By Eve

RIOD Logic Pvt Ltd, headquartered at Infopark Thrissur, has opened a manufacturing subsidiary at Vengoor, Nedumbassery, with current capacity of around 2,500 chargers a month. The facility builds AC chargers from 3.3 kW to 22 kW, and RIOD also offers DC charger development and energy products as OEM and ODM solutions, plus CKD and SKD kits for partners who assemble locally and for export markets. Chargers made there support dynamic UPI payments, a community mode for shared use in apartments, offices and housing societies, and secure communication between charger and cloud, in contrast with the static QR codes used on most UPI-enabled chargers today.

Why it matters

Local capacity of around 2,500 AC units a month, with CKD and SKD and OEM and ODM options, gives Indian CPOs and partners another supply route for white-label or locally assembled hardware. Dynamic UPI payments that show the session cost address a known weakness of static QR codes, which leave drivers unsure of the rate and hosts struggling to reconcile payments.

Source

Original title
“RIOD Logic Opens EV Charger Manufacturing Subsidiary at Nedumbassery and Launches dynamic UPI-based EV chargers”
Published
17 November 2026

In this story

Related news

Jharkhand transport department proposes 500 EV charging stations, one every 20km on highways and major roads

Jharkhand's transport department has sent the government a formal proposal for 500 EV charging stations across the state, with a charging point every 20km on national highways, state highways and major district roads. Transport secretary Rajeev Ranjan said the stations would run under a public-private partnership model, with landowners or leaseholders along highways invited to apply, and a subsidy of around 20% to 25% for women and Scheduled Caste or Scheduled Tribe applicants, with 50% of financing arranged through banks. The Times of India report notes FADA data showing EV sales in the state rose over 56% year on year in June 2026, to 4,174 units from 2,731.

Why it matters

If approved, this would be the department's first large scale charging programme, opening a landowner-led PPP route for site hosts and operators along Jharkhand's highways. The subsidy and bank financing structure, and the technical set-up (the excerpt is cut off before it is detailed), will determine how bankable the sites are for CPOs and equipment suppliers.

India
17 Nov 2026

Jharkhand transport department · Source

CATL plans to double its Choco battery swap network to 6,000 stations across 297 Chinese cities by 2027

CATL aims to operate 5,000 city and 1,000 motorway Choco swap stations by 2027, with the motorway network covering 11 north to south and nine east to west routes. Its station count rose from 1,020 at the end of 2025 to 2,000 in July and 2,520 by 29 September, with a target of 3,000 by the end of 2026. Nio, the largest passenger car swap operator in China, has 4,254 stations, 1,081 of them on motorways, and the report says leadership by station count could change hands in 2027 if CATL hits its goal and Nio keeps adding about 1,000 a year.

Why it matters

Swapping is scaling in China at a pace that competes directly with plug-in charging on motorway corridors, which matters for anyone sizing long-term charging demand and site strategy. The BAIC agreement to build vehicles around CATL's swappable batteries and to support station installation through its dealer network shows that vehicle supply is being developed alongside the infrastructure.

Global
17 Nov 2026

CATL (global) · Source

Circle K Reaches 100 Own-Brand EV Charge Points in Ireland and Plans €8 Million Further Investment

Circle K has switched on its 100th own-brand EV charge point at its Maynooth, Co. Kildare site, an eight-point hub opened by Minister Darragh O'Brien, according to techbuzzireland. This takes the number of Circle K sites with own-brand charging in Ireland to 32, with six more due to be energised in the coming months. The retailer plans to invest approximately €8 million over the next 18 months to add 90 charge points across 11 sites, including three large hubs of 10 to 20 charge points each, following more than €12 million already invested.

Why it matters

A forecourt operator with a funded 18-month pipeline of 90 charge points across 11 sites signals continued demand for hardware, grid connection and installation contractors in Ireland. The three larger hubs of 10 to 20 points are the most likely packages for suppliers and EPC partners to target.

Ireland
17 Nov 2026

Circle K · Source