Skip to content
Grid & Energy
Italy

RWE begins building 62.5 MW battery storage project in Ragusa, Sicily

By Eve

German energy company RWE has started construction of its first Italian battery storage facility in Ragusa, Sicily, with operation expected in late 2027, according to Interesting Engineering and a republished report by The Cool Down. The lithium ion system will use 42 containers, deliver a maximum output of 62.5 MW sustained for four hours, and provide 262.5 MWh of storage capacity. RWE says its planned output over an evening demand peak would meet the electricity needs of about 21,000 households.

Why it matters

Storage that shifts surplus power into the evening peak points to added grid flexibility in southern Italy, which matters for charge point operators planning evening heavy charging sites. The report does not link the project to EV charging, so any benefit would be indirect and dependent on grid conditions.

Source

Original title
“RWE breaks ground on 42-container battery to store surplus power for the evening rush”
Published
23 November 2026

In this story

Related news

Eight potential hosts express interest in New York advanced nuclear project as opponents warn on bills

Eight parties, including Wayne County and RED-Rochester, the utility provider for Eastman Business Park, responded to a New York Power Authority location inquiry for an advanced nuclear project, with another 23 responses coming from prospective developers and partners. Gov. Kathy Hochul announced a completed road map calling for 5 gigawatts of new nuclear generation at a Rochester summit, but said there is no timetable for next steps, according to WHAM as reported by The Cool Down. Opponents warn that using public money to fund new plants could leave residents facing higher electricity bills for decades.

Why it matters

A 5 gigawatt nuclear ambition signals long-term supply planning in New York that could shape grid capacity and power pricing for future charging sites. With no timetable and cost concerns raised, CPOs should treat it as a distant factor rather than a near-term input to tariff or capacity assumptions.

United States
23 Nov 2026

Source

Ellomay announces long term PPAs and a ground lease for its Mexia Solar Facility in Texas

Ellomay has announced that it executed long term power purchase agreements and a ground lease for the Mexia Solar Facility in Texas, according to a headline on the ELLO stock news page. The excerpt gives no capacity, offtaker, price, tenor or financing figures. The rest of the text is unrelated market headlines.

Why it matters

The item shows a Texas solar project securing offtake and site control, but it has no direct EV charging link and no disclosed terms. CPOs and procurement teams should treat it as background on Texas renewable supply until fuller details emerge.

United States
23 Nov 2026

Ellomay · Source

Ireland may allow plug in solar kits by April or May as households already buy them online

The Cool Down reports that plug in solar kits, small panel and battery setups that connect to a wall socket, cost about €500 ($550) and could save a household about €200 ($220) a year. Energy Minister Darragh O'Brien plans to take proposals to government through an accelerated regulatory process, and the Department of Climate, Energy and the Environment said the technology may be permitted by April or May, according to Cork Beo. Current rules require grid connected systems to be professionally installed, yet some residents have already bought DIY kits.

Why it matters

A change to Irish connection rules would open a low cost, household scale route to generation and storage behind the meter, which could affect home charging demand and the market for professionally installed systems. Procurement teams and CPOs should watch the timing and the final technical requirements, as neither is confirmed in this report.

Ireland
23 Nov 2026

Source