Skip to content
EV Charging
United Kingdom

Second window of UK Depot Charging Scheme opens with £38 million of funding

By Eve

The second application window of the Government's Depot Charging Scheme opened at midday on 11 November 2026, after a two-week delay, and closes at midday on 26 February 2027. It offers £38 million toward charge point and civil engineering costs at fleet depots, with funding of up to 60%, down from 70% in the first round, and a cap of £1 million per organisation across all sites. Applications are assessed first come, first served unless demand exceeds funding, in which case a competitive process may be used, and projects must be completed by 31 March 2028.

Why it matters

The lower intervention rate means fleets must carry a larger share of project costs, which may affect business cases and the pace of depot orders. The one application per organisation limit and the 31 March 2028 completion deadline put a premium on early, well-scoped bids and deliverable programmes from installers and CPOs.

Source

Original title
“second window depot charging scheme opens ps38m funding”
Published
12 November 2026
Also covered by
fleetpoint.org

Related news

Edmonton homeowner asks Reddit how to charge a new Tesla mainly from rooftop solar and is warned about extra equipment

In a Reddit r/Solar thread, reported by The Cool Down, an Edmonton homeowner asked how to charge a new Tesla mostly from solar, particularly in summer when they would be selling and buying at peak rates. The poster said an electrician had offered to install a dedicated garage connection, and that the house's 100-amp service also supports a hot tub, air conditioning and other large loads. One commenter warned that charging purely from solar would need equipment such as a string inverter that monitors grid imports and exports and directs solar to specific loads, while another said they plug in on arrival home, charge to 80% daily before dark and have had no electric bill in 2 years.

Why it matters

The thread shows residential demand for solar-matched charging running into practical limits, including a 100-amp service and the need for load-aware equipment, which is relevant to anyone specifying home charging or energy management products. It also signals that installers and suppliers who can offer simple solar-aware charging control may find an opening, though this is one anecdotal forum discussion rather than market data.

Canada
15 Nov 2026

Tesla · Source

Oklahoma to Washington EV road trip prompts advice on $7 Electrify America pass for 25% off charging

A driver planning a trip from Oklahoma to Washington in a 2024 Ford Mustang Mach E asked Reddit how to keep charging costs down, with ABRP estimating 38 to 42 hours of journey time based on roughly 250 miles of range. One commenter recommended Electrify America Pass Plus, which they said costs $7 per month, gives 25% off charging and carries no early cancellation fee, so $28 of eligible charging would cover the fee. The driver hopes to use Tesla Supercharger off peak rates and avoid prices of $0.60 per kilowatt hour or more, according to The Cool Down.

Why it matters

Long distance drivers are comparing membership discounts and price thresholds before they set off, and $0.60 per kilowatt hour is named as a price they want to avoid. CPOs and network operators can read this as evidence that subscription value and off peak pricing influence where drivers choose to charge.

United States
14 Nov 2026

Source

US EV owner quoted $8,066.71 for a garage outlet expected to cost around $1,000

An electrician quoted $8,066.71 to install a 50-amp garage outlet for an EV owner who had expected to pay around $1,000, according to a report from The Cool Down based on a Reddit post. The job involved 25 feet of cable through an unfinished basement ceiling into an attached garage, with cable at $1,372.50, a breaker at $615.42 and a breaker lockout at $448.38, plus a separate $5,301.90 charge for the outlet, circuit, GFCI breaker and charger installation. Several Reddit users described installations costing substantially less, including ones with longer cable runs.

Why it matters

The gap between homeowner expectations and installer quotes shows how opaque and inconsistent residential charging installation pricing can be, which affects demand for home charging and the case for itemised, benchmarked quotes. Installers and CPOs working in the home and small commercial segment may find that clear pricing is a competitive advantage.

United States
14 Nov 2026

Source