Skip to content
Grid & Energy
Spain
Global

SmartestEnergy acquires Spanish energy firm Factor Energia for €204 million

By Eve

SmartestEnergy has purchased Factor Energia, a Spanish energy company, for €204 million as part of its global expansion strategy. The acquisition was reported by The Energyst and marks a significant move into the Spanish market for the UK-based energy services provider.

Why it matters

The deal strengthens SmartestEnergy's European presence and could expand its capacity to support EV charging infrastructure and renewable energy procurement across Spain, a growing market for electric mobility and grid services.

Source

Original title
“SmartestEnergy expands global footprint with €204 million acquisition of Spanish energy firm Factor Energia”
Published
17 April 2026 (date approximate)
Updated
22 September 2026

In this story

Related news

86% of new European wind startups now focus on alternative turbines, software and sensors

The share of European wind energy startups working on conventional horizontal axis turbines has dropped from 64% in 1996 to 2000 to just 14% in 2021 to 2025, according to Avnet Silica research analysing Crunchbase data. Alternative turbine designs now account for 37% of new startups, while software and sensors represent 49%, with the latter split across wind measurement and forecasting (31%), turbine monitoring and inspection (29%), and performance optimisation and predictive maintenance (26%). The study examined European startups developing wind energy hardware and software, excluding project developers, installers and consultants.

Why it matters

The shift signals a maturing wind sector where innovation has moved from core turbine manufacturing to digital optimisation and novel designs, potentially opening procurement opportunities in monitoring, forecasting and maintenance software for operators managing large wind portfolios. For EV charging professionals, the trend mirrors the sector's own evolution towards software led asset management and predictive maintenance platforms.

Europe
9 Oct 2026

Source

California grid operator issues maintenance restrictions as heat wave drives demand toward supply limits

The California Independent System Operator issued a Restricted Maintenance Operations notice for 10 a.m. to 10 p.m. on 5 and 6 October, asking suppliers not to take actions affecting generator or transmission availability as a heat wave pushed demand in Los Angeles and surrounding areas closer to grid capacity. Cal-ISO said it was not forecasting supply shortfalls but wanted to prepare consumers for a possible Flex Alert, a voluntary conservation request issued when electricity demand could exceed available supply. Southern California Edison said it is monitoring the system and preparing for potential impacts of increased electrical demand, noting very high temperatures can increase strain and raise the odds of temporary outages.

Why it matters

Grid strain events highlight the need for distributed energy resources and managed charging strategies that can shift EV load away from peak hours, reducing pressure on transmission infrastructure. Utilities and charge point operators in high demand regions may face stronger incentives to deploy smart charging and vehicle to grid capabilities that support grid stability during heat driven peaks.

United States
9 Oct 2026

Source

New Orleans approves $23.6 million home battery scheme with 40% reserved for lower income households

New Orleans City Council has unanimously approved a $23.6 million battery storage initiative to provide backup power to approximately 800 homes and more than 200 businesses. The scheme reserves 40% of upfront funding for low and moderate income households and forms part of the city's Neighborhood Power Plan microgrid effort. Council Vice President Matthew Willard described it as the largest per capita investment in distributed battery storage in the nation.

Why it matters

The programme signals growing municipal investment in residential energy resilience infrastructure, creating procurement opportunities for battery suppliers and installers targeting public sector contracts. The 40% low income allocation may influence how vendors structure bids and financing models for similar schemes elsewhere.

United States
8 Oct 2026

New Orleans (us) · Source