Skip to content
EV Charging
Canada

Kamloops deploys 112 charging ports within 15 kilometres of city centre as one in five new BC vehicles goes electric

By Eve

Kamloops, British Columbia, now operates 112 charging ports within 15 kilometres of the city centre, including 49 fast charging stations that deliver empty to full charges in 25 to 30 minutes. The infrastructure expansion supports a market in which one in five new vehicles sold in BC in 2025 is a zero emission vehicle, part of a provincial fleet exceeding 210,000 EVs. New homes in the city are being built with EV ready infrastructure, and fast chargers include the BC Fast Charger at Tournament Capital Centre and a Tesla Supercharger at the former visitor centre.

Why it matters

The 112 port network demonstrates how mid sized Canadian cities are scaling public charging to match rapid EV adoption, with fast charging density critical for both resident convenience and intercity travel. Procurement teams and charge point operators will note the integration of provincial Electric Highway standards and the inclusion of EV ready requirements in new residential builds.

Source

Original title
“SOUND OFF: Kamloops builds a thriving electric vehicle charging network”
Published
7 February 2026 (date approximate)
Updated
18 July 2026

In this story

Related news

PPC blue and Cometex to install over 300 charging points across Romania with 20 MW capacity

PPC blue and Cometex have deployed 20 charging points to date across six Romanian cities, including an eight point, 450 kW hub at Aurora Retail Park in Giurgiu. The partnership will add more than 300 new charging points with an estimated total installed capacity exceeding 20 MW, including sites at Bricostore locations, while PPC blue will take over Cometex's existing network of more than 87 charging points at retail parks nationwide.

Why it matters

The rollout demonstrates a retail focused charging strategy targeting high footfall locations, with the network integration offering procurement teams a consolidated operator relationship across multiple Romanian retail sites. The 20 MW pipeline signals significant grid connection and equipment supply opportunities for contractors and hardware vendors in the Romanian market.

22 Oct 2026

PPC blue · Cometex · Source

Andersen EV launches Range Rover Collection home chargers in six configurations

Andersen EV has introduced the Andersen Range Rover Collection of home chargers, comprising six configurations for the Andersen Quartz and A3 models, inspired by the Range Rover Electric and Range Rover Sport Electric. The collection features three palettes based on Range Rover exterior colours, including the Blackthorn collection inspired by Santorini Black paint. Each charger is made to order at Andersen's Bedfordshire facility, with in house development, production quality control and dedicated customer care.

Why it matters

The partnership between Andersen EV and Range Rover signals growing collaboration between premium automotive and charging brands to offer integrated home charging solutions. For CPOs and installers, branded charger collections tied to specific vehicle models may open new sales channels through dealership networks and affluent homeowner segments.

United Kingdom
22 Oct 2026

Andersen EV (uk) · Range Rover (uk) · Source

Seattle opens applications for 200 curbside Level 2 chargers targeting apartment areas by 2030

Seattle City Light is accepting resident applications for up to 200 new curbside Level 2 EV chargers to be installed from fall 2027 through 2030, prioritising multifamily housing areas with limited existing charging. The city will review applications and select locations in batches of 40 to 50 sites, with design and permitting starting spring 2027 and each site requiring approximately two weeks of construction. Seattle already operates 58 chargers from an earlier pilot programme.

Why it matters

The resident led application process and phased procurement model offers a replicable framework for cities targeting underserved multifamily housing, with clear timelines for design, permitting and installation that CPOs and contractors can plan around. The batch selection approach creates predictable tender windows for equipment suppliers and installation firms through to 2030.

United States
22 Oct 2026

Source