Skip to content
EV Charging
United States

EVgo opens first Tesla Supercharger powered station in Chicago, with hundreds more stalls planned

By Eve

EVgo has opened its first location built on Tesla hardware, a 12 stall station in Chicago that uses Tesla's Magic Dock connector to serve both NACS and CCS equipped vehicles. EVgo says this starts an expansion covering hundreds more Supercharger stalls nationwide, beginning with sites at grocery stores and shopping centres owned by Regency Centers, and it aims to add at least one NACS port to every station built after 2023 within the next two years. Tesla's V4 cabinets, which offer speeds up to 500 kW, are now available for purchase and installation by any commercial client.

Why it matters

Tesla is now a hardware supplier to a direct network competitor, which shows V4 cabinets are a credible procurement option for CPOs. The Magic Dock approach also offers a template for serving both NACS and CCS drivers at the same site during the connector transition.

Source

Original title
“Tesla Is Now Powering One Of Its Biggest Charging Rivals”
Published
5 November 2026
Updated
9 November 2026
Also covered by
electrek.co · electrive.com · evchargingstations.com · evinfrastructurenews.com · and more via Google News (1, 2, 3)

In this story

Related news

LS Power proposes to take EVgo private at $2.00 per share

EVgo said it received an unsolicited, non-binding proposal from LS Power Equity Advisors and its affiliates to acquire all Class A common stock it does not already own, for cash at $2.00 per share. LS Power holds approximately 56% of EVgo's combined voting power. The announcement is dated 2 November 2026 in the EV Charging News Blog report, which describes EVgo as one of the nation's largest providers of public fast charging infrastructure in the United States.

Why it matters

A change of ownership at a major US fast charging operator could shift its capital allocation, site roll-out priorities and supplier relationships, so partners and bidders should watch for updates. The proposal is non-binding, so the outcome remains uncertain.

United States
7 Nov 2026

EVgo · Source

Tesla to wind down Cybertruck production at Gigafactory Texas around mid 2027

Elon Musk announced that Tesla will wind down Cybertruck production at Gigafactory Texas around the middle of 2027, about three and a half years after first deliveries, citing the need to make room for more Cybercab output. The report estimates 7,000 to 8,000 Cybertrucks were delivered in Q3 2026, a pace of about 30,000 a year, against a line planned for 250,000 units annually and more than 125,000 units of installed capacity. Tesla's "Other Models" bucket, which includes the Cybertruck, totalled 8,295 deliveries in Q3 2026, down 48% year over year and the lowest since Q2 2021.

Why it matters

The Cybertruck's small and shrinking fleet means it adds little to charging demand, while the shift to Cybercab shows where Tesla is putting its manufacturing priority. Tesla has not yet said how long inventory will be sold or what happens to parts and service for existing owners, which operators of mixed fleets should watch.

United States
6 Nov 2026

Tesla · Source

Cedar Key adds EV charging station with two parking spots behind city hall

Cedar Key City Hall in Florida has gained a new EV charging station, with two new parking spots located behind the building. WCJB reports that the console includes a card tap function for payment. City leaders say the addition will make life more convenient for electric vehicle drivers.

Why it matters

Small municipal installs like this show contactless card payment becoming standard on publicly owned chargers, even in small coastal towns. For CPOs and suppliers, city hall sites are a repeatable, low-scale opportunity, though the report gives no detail on power output, hardware or operator.

United States
10 Nov 2026

Cedar Key · Source