Tesla opens first Megacharger site with Pilot in Georgia, 12 more under construction
By Eve
Tesla has launched its first Megacharger site at Pilot travel centre #1390 in Ellabell, Georgia, featuring six heavy-duty charging stalls under a partnership announced in January 2026. Twelve additional locations are under construction across major US freight corridors, with three sites in California, Texas and Nevada nearing completion. Each location will feature four to eight high-power stalls using Tesla's V4 cabinet technology, delivering up to 1.2MW per stall to recover 60% charge in 30 minutes for a Tesla Semi.
Why it matters
The rollout marks the first commercial deployment of Tesla's Megacharger network for heavy-duty electric trucks, targeting long-haul freight operators along Interstate 5, Interstate 10 and other key routes. For CPOs and fleet operators, the 1.2MW charging capacity and strategic Pilot travel centre locations signal a new infrastructure model for electrifying commercial trucking at scale.
Source
- Original title
- “tesla opens first megacharger site with pilot in georgia”
- Published
- 13 October 2026
- Also covered by
- electrive.com · and more via Google News (1, 2, 3)
In this story
- Topic
- EV Charging
- Place
- United States
- Tag
- Tesla
Related news
Tesla leads US fast charger growth with 1,287 Q3 ports as national total passes 80,000
The US reached 80,964 public fast charging ports across 14,614 locations by end September 2026, adding 4,106 ports at 664 stations in Q3, according to Paren's quarterly report. Tesla installed 1,287 ports plus 124 via Supercharger for Business, ahead of IONNA with 378 ports and Walmart with 344. New non-Tesla sites averaged five ports, up from 4.1 a year earlier, though Q3 rollout slowed with about 9% fewer ports and 20% fewer stations than the same period in 2025.
Why it matters
Larger average site sizes reduce the risk of occupied stalls for fleet operators and public users, improving utilisation planning. The slowdown in station openings against rising port counts per site signals a shift toward fewer but higher capacity installations, relevant for CPOs evaluating deployment strategies and procurement teams assessing network coverage.
Tesla Powerwall autonomously grid-charged before peak rates to offset low solar yield in Arizona
A Tesla Powerwall owner in Tucson, Arizona, reported that the battery began charging from the grid at around 2:30 p.m. on a rainy day, ahead of a 3 to 7 p.m. peak rate window, after solar generation fell short. The homeowner had set the system to Saving mode and disabled Stormwatch, allowing the Powerwall to draw enough grid power to cover the high cost period. The case, shared on Reddit's r/Powerwall forum, illustrates how residential storage can automatically balance low renewable output with time of use tariffs.
Why it matters
The example shows demand side flexibility in action, with home batteries responding to tariff signals and weather conditions without manual intervention. For CPOs and utilities, it underscores the growing role of behind the meter storage in load shifting and the need for rate structures that reward or integrate such behaviour at scale.
Tesla enables bidirectional charging for new Model 3 and Model Y orders in US with Powerwall 3
Tesla has extended its PowerShare home backup feature to new Model 3 and Model Y vehicles ordered from 1 October 2026 onwards in the US and Puerto Rico, previously available only on the Cybertruck. The capability requires a Powerwall 3 home battery and compatible charger, with Tesla stating the setup can extend home backup by over two days using the vehicle's battery.
Why it matters
This marks a significant expansion of vehicle to home charging infrastructure in the residential market, potentially driving demand for integrated Tesla energy systems. For charging point operators and installers, it signals growing competition from OEM controlled bidirectional solutions that bypass third party hardware.