Tesla submits plans for 16 supercharger hub with solar canopy near Somerset A303
By Eve
Tesla has applied to Somerset Council for a charging facility at the Wincanton Gateway site off the A303, featuring 16 supercharger units under a solar canopy, a substation and a battery energy storage unit. The site, adjacent to a McDonald's on the A371 Lawrence Hill, will use stored solar energy to reduce grid pressure, with a decision expected before Christmas. Planning Potential confirmed the network is open to all EVs, not Tesla vehicles exclusively.
Why it matters
The 16 bay hub with onsite solar and battery storage offers a model for grid friendly rapid charging infrastructure on strategic trunk roads. Somerset Council's pre Christmas decision timeline gives CPOs and contractors a near term signal for similar roadside developments.
Source
- Source
- https://www.somersetlive.co.uk/news/somerset-news/tesla-plans-electric-vehicle-charging-11150339
- Original title
- “Tesla plans electric vehicle charging facility near Somerset McDonald's off A303”
- Published
- 11 September 2026
- Also covered by
- Google News
In this story
- Topic
- EV Charging
- Place
- United Kingdom
- Tag
- Tesla
Related news
Tesla confirms Vietnam entry with five hires including charging project developer
Tesla has begun recruiting for five roles in Vietnam, including a charging project developer, after registering Tesla Motors Vietnam LLC in Ho Chi Minh City on 11 September with roughly 77.7 billion dong (approximately $3 million) in charter capital. A Tesla recruiter confirmed the company is officially entering the market, where local EV maker VinFast has captured roughly 36% of new car sales this year. The hiring pattern mirrors Tesla's Thailand entry in September 2022, where it opened orders three months after a similar recruitment drive.
Why it matters
The charging project developer role signals Tesla plans to deploy Superchargers in Vietnam, creating procurement opportunities for construction and electrical contractors. VinFast's 36% market share means Tesla faces established charging infrastructure competition, potentially accelerating buildout timelines to match local expectations.
Solar powered EV charging in Andhra Pradesh still at an early stage despite favourable conditions
A report on Nellore says Andhra Pradesh has abundant sunshine, a growing renewable energy ecosystem and rising interest in electric mobility, but solar powered charging remains nascent. Stations use rooftop or ground mounted solar panels with Battery Energy Storage Systems (BESS) to smooth fluctuations, drawing from the grid only when necessary. The article notes that public charging infrastructure in the state remains sporadic despite growing EV sales and strong government backing, and that Convergence Energy Services Ltd. (CESL), a subsidiary of Energy Efficiency Services Ltd. (EESL), was the first to deploy an integrated solar powered charging station in India.
Why it matters
Lower electricity costs at solar and BESS equipped sites could let charge point operators pass savings on to drivers, which makes Andhra Pradesh a potential market for integrated solar plus storage charging projects. The patchy public network, particularly for intercity travel, points to unmet demand for developers and funders.
Los Alamos County to open new DC fast charging stations at Mesa Public Library with ribbon cutting on 2 November
Los Alamos County has invited the community to a ribbon cutting ceremony on 2 November marking the opening of new Direct Current (DC) fast charging stations in the Mesa Public Library parking lot. The project was funded in part by the New Mexico Department of Transportation (NMDOT). County Sustainability Manager Angelica V. Gurule described the stations as a step toward expanding public EV charging infrastructure and supporting more sustainable transport in the community.
Why it matters
This is another example of state transport funding supporting municipal DC fast charging at public civic sites, a route that can open opportunities for CPOs and installers working with local authorities. The announcement gives no figures on charger count, power output or funding value, so those details would need to be confirmed directly.