Skip to content
EV Charging
United States

US states diverge on home electrical work as 2026 code bans DIY EV charger installs while 34 states permit plug in solar

By Eve

The 2026 National Electrical Code, published 20 August 2025 by the National Fire Protection Association, introduces Section 625.4 requiring permanently installed EV chargers to be fitted by qualified persons, effectively banning homeowner installation in most US states as they adopt the update through 2026 and 2027. Meanwhile, 34 states are moving to allow homeowners to install two to four panel plug in solar kits costing around 2,000 US dollars without permits or utility agreements, with Utah, Virginia and Maine already enacting such laws between March 2025 and April 2026.

Why it matters

The code change will push more residential EV charger work to licensed contractors and may slow home charging adoption if installation costs rise, while the solar exemptions signal a policy split that could complicate bundled home energy and charging propositions for charge point operators and installers.

Source

Original title
“Three US States Just Made It Legal to Generate Your Own Electricity Without a Permit. A New National Electrical Code Will Soon Ban DIY EV Charger Installation in Most States That Adopt It”
Published
19 May 2026 (date approximate)
Updated
22 September 2026

In this story

Related news

Believ to install more than 600 chargers across Ayrshire in 15 year council partnership

EV charge point operator Believ has secured a 15 year agreement with three Ayrshire councils to install more than 600 chargers at around 300 locations, with installation beginning in early 2027. The project combines over £2.8m from the Scottish Government's EV Infrastructure Fund with more than £15m in committed capital investment from Believ, delivered alongside Transport Scotland and the Scottish Futures Trust. The rollout includes roughly 180 chargers for East Ayrshire, 210 for North Ayrshire and 220 for South Ayrshire, with passive infrastructure for over 450 additional chargers to enable future upgrades without disruptive roadworks.

Why it matters

This major regional deployment demonstrates how CPOs can secure long term public sector contracts by combining government funding with substantial private capital, creating a scalable model for rural and island charging access. The inclusion of passive infrastructure for 450 additional chargers shows forward planning that reduces future deployment costs and speeds network expansion as EV adoption grows.

United Kingdom
9 Oct 2026

Believ · Source

Vietnam mandates cross-brand compatibility at public EV chargers from July 2027

Circular 61/2026/TT-BCT, issued by Vietnam's Ministry of Industry and Trade, requires public EV charging stations to serve vehicles from multiple manufacturers starting 1 July 2027. Operators must install compatible connectors, charging modes and technical specifications, and station control systems must not restrict charging for publicly declared compatible vehicle configurations. The regulation emphasises technical compatibility without mandating support for all vehicle brands, The Investor reported on 8 October.

Why it matters

The rule forces charging point operators in Vietnam to design infrastructure for interoperability, potentially raising upfront costs but widening the addressable customer base. Procurement teams and OEMs will need to verify that hardware and software meet the new compatibility standards ahead of the July 2027 deadline.

Vietnam
9 Oct 2026

Source

Tesla and Pilot deploy over a dozen Megacharger stations for Semi trucks across US freight corridors

Pilot Travel Centers and Tesla are building more than a dozen megawatt charging stations for Tesla Semi trucks along major US freight routes, with the first site already operational in Ellabell, Georgia. Each station will feature four to eight Megachargers capable of delivering up to 1.2 megawatts per stall, located at Pilot sites along I-5, I-10 and other corridors in California, Indiana, Nevada and Texas. The Ellabell station has six stalls, while a separate Tesla Semi station in Conley, Georgia, has also been energised this week.

Why it matters

This rollout demonstrates how CPOs can secure anchor tenancy by co-locating high power charging infrastructure at established commercial vehicle rest stops, reducing range anxiety for fleet operators. The partnership between North America's largest travel centre network and Tesla establishes a template for scaling heavy duty charging along predictable freight routes.

United States
9 Oct 2026

Tesla (us) · Source