ubitricity secures 10 year solar PPA with Shell for UK charging network
By Eve
ubitricity, the UK's largest public EV charging network and a Shell subsidiary, has signed a 10 year Power Purchase Agreement to supply over 16 GWh of renewable solar energy annually to its network of more than 14,600 public charge points across the UK. The deal, announced on 3 July 2026, is expected to help stabilise energy costs across the network and directly support UK solar energy assets.
Why it matters
Long term renewable PPAs like this 10 year solar contract demonstrate how major charge point operators are locking in stable energy costs at scale, a procurement strategy that could influence pricing competitiveness and operational margins across the UK's 14,600 plus site network. The deal signals growing integration between EV charging infrastructure and domestic renewable generation assets.
Source
- Original title
- “{"@context":"https:\/\/schema.org","@type":"NewsArticle","url":"https:\/\/www.zapmap.com\/news\/ubitricity-secures-10-year-solar-deal-shell-uk-network","headline":"ubitricity secures 10-year solar deal with Shell for UK network","alternativeHeadline":"2026-07-03","image":{"@type":"ImageObject","url":"https:\/\/www.zapmap.com\/sites\/default\/files\/styles\/metatag_default\/public\/zap_map_templates\/migration\/ubitricity-lamp-post-charge-point.jpg?itok=dXpmz4UD","width":1200,"height":630},"datePublished":"2026-07-03","dateModified":"2026-07-06","author":{"@type":"Person","name":"Zapmap"},"publisher":{"@type":"Organization","name":"Zapmap","logo":{"@type":"ImageObject","url":"https:\/\/www.zapmap.com\/themes\/custom\/zap_map\/assets\/logo.svg","width":157,"height":34}},"description":""} Published 03/07/2026 ubitricity secures 10-year solar deal with Shell for UK network Learn more”
- Published
- 3 July 2026
- Updated
- 18 July 2026
- Also covered by
- Google News
In this story
- Topic
- EV Charging
- Place
- United Kingdom
- Tags
- ubitricity · Shell
Related news
Believ to install more than 600 chargers across Ayrshire in 15 year council partnership
EV charge point operator Believ has secured a 15 year agreement with three Ayrshire councils to install more than 600 chargers at around 300 locations, with installation beginning in early 2027. The project combines over £2.8m from the Scottish Government's EV Infrastructure Fund with more than £15m in committed capital investment from Believ, delivered alongside Transport Scotland and the Scottish Futures Trust. The rollout includes roughly 180 chargers for East Ayrshire, 210 for North Ayrshire and 220 for South Ayrshire, with passive infrastructure for over 450 additional chargers to enable future upgrades without disruptive roadworks.
Why it matters
This major regional deployment demonstrates how CPOs can secure long term public sector contracts by combining government funding with substantial private capital, creating a scalable model for rural and island charging access. The inclusion of passive infrastructure for 450 additional chargers shows forward planning that reduces future deployment costs and speeds network expansion as EV adoption grows.
Vietnam mandates cross-brand compatibility at public EV chargers from July 2027
Circular 61/2026/TT-BCT, issued by Vietnam's Ministry of Industry and Trade, requires public EV charging stations to serve vehicles from multiple manufacturers starting 1 July 2027. Operators must install compatible connectors, charging modes and technical specifications, and station control systems must not restrict charging for publicly declared compatible vehicle configurations. The regulation emphasises technical compatibility without mandating support for all vehicle brands, The Investor reported on 8 October.
Why it matters
The rule forces charging point operators in Vietnam to design infrastructure for interoperability, potentially raising upfront costs but widening the addressable customer base. Procurement teams and OEMs will need to verify that hardware and software meet the new compatibility standards ahead of the July 2027 deadline.
Tesla and Pilot deploy over a dozen Megacharger stations for Semi trucks across US freight corridors
Pilot Travel Centers and Tesla are building more than a dozen megawatt charging stations for Tesla Semi trucks along major US freight routes, with the first site already operational in Ellabell, Georgia. Each station will feature four to eight Megachargers capable of delivering up to 1.2 megawatts per stall, located at Pilot sites along I-5, I-10 and other corridors in California, Indiana, Nevada and Texas. The Ellabell station has six stalls, while a separate Tesla Semi station in Conley, Georgia, has also been energised this week.
Why it matters
This rollout demonstrates how CPOs can secure anchor tenancy by co-locating high power charging infrastructure at established commercial vehicle rest stops, reducing range anxiety for fleet operators. The partnership between North America's largest travel centre network and Tesla establishes a template for scaling heavy duty charging along predictable freight routes.