AA UK EV Readiness Index rises from 47.5 to 60 out of 100 in little over a year
By Eve
The AA says Britain's shift to electric vehicles has reached a "turning point", citing cheaper cars, better charging access and an improved ownership experience. Its latest data shows just 1.2% of EV breakdowns are now due to running out of charge, compared with 8.3% in 2015, and in 40% of those cases the driver could reach a charger followed by the AA patrol. The AA also reports that 87.5% of EV breakdowns are repaired at the roadside, against 84.6% for petrol or diesel vehicles, with 99% of patrols trained to Level 2 Electric Vehicle Prepared standard.
Why it matters
Falling range anxiety related breakdowns and a higher index score point to growing driver confidence in the charging network, which supports the demand case behind new site investment and tenders. CPOs and funders can use the figures as evidence that access and reliability improvements are shifting consumer behaviour, although the excerpt does not break down the index by charging infrastructure alone.
Source
- Original title
- “UK ‘EV readiness’ jumps as affordability and charging improve, AA data shows”
- Published
- 12 November 2026
- Updated
- 16 November 2026
In this story
- Topic
- EV Charging
- Place
- United Kingdom
- Tag
- AA
Related news
Terawatt Infrastructure announces four new US fleet charging depots totalling 22MW
Terawatt Infrastructure has announced depots in South San Francisco, Nashville, Miami and Dallas with a combined capacity of 22MW. The San Francisco, Nashville and Dallas sites are near regional airports and supply 6.6MW, 4.5MW and 7MW respectively, while the Miami site in the Design District and Wynwood area is due to open this quarter and will provide a further 3.5MW. Terawatt developed and built all four, managed the utility connections and will operate them with its proprietary charge management software, and it has nearly 30 more depots in construction or development across the US.
Why it matters
Terawatt says it acquires, develops and operates sites as a turnkey service, rather than following the common 'powered land' model, which sets it apart for fleet operators weighing how much delivery risk to carry. Its pipeline of nearly 30 further depots, and its stated plan in June 2026 to borrow up to $300 million, particularly for the robotaxi sector, signal continued competition for fleet charging contracts and sites.
French tenants seeking a parking space charger must choose between a collective or individual route
A guide for tenants in French apartment blocks says the route depends on the request. For a collective installation, Enedis tells tenants to approach their landlord first, who relays the request to the syndic (the building manager), who can gather residents' needs, seek proposals and put them to a general assembly. For an individual charger under the right to a socket, the syndic must also receive a copy of the tenant's notification. The article states the rules as applicable in France on 16 November 2026.
Why it matters
Tenant demand in French multi-occupancy buildings reaches projects through landlords and syndics, so early needs gathering and general assembly votes shape the pipeline. Tenants should also check for studies or votes already under way before ordering a unit, and installers and CPOs should engage those parties early.
Opinion piece says Kyrgyzstan's EV incentives have outpaced charging infrastructure, leaving apartment residents improvising
An opinion piece argues that Kyrgyzstan's green transition is paradoxical: state strategies, including the Renewable Energy Development Program for 2026 to 2030, and quotas to import electric vehicles promote EVs, while charging stations and technical and regulatory frameworks lag behind. It cites statistics showing Bishkek has 205,000 registered apartments against about 90,000 individual houses, a ratio of more than 2.2 to 1, so most residents cannot install a home charger in a garage or yard. The article illustrates the problem with an EV charged from a condo balcony via two joined extension cords hung from a tree, which it describes as a fire hazard.
Why it matters
Bishkek shows how import incentives without matching multi-dwelling charging provision push drivers towards unsafe workarounds, which points to unmet demand for shared and residential charging. For CPOs and funders, the housing mix and the regulatory gaps highlight where standards, safe installation rules and public or communal charging models would be needed.