Skip to content
Grid & Energy
Global

UL Solutions launches V2G certification programme for bidirectional EV chargers

By Eve

US testing and certification company UL Solutions has launched a certification programme for vehicle to grid technologies, enabling testing and certification of bidirectional EV supply equipment under UL 1741 Supplement SC, the standard for inverters and interconnection equipment for distributed energy resources. Products certified under the programme can work with EVs using onboard bidirectional inverters designed to SAE J3072, and can also be certified for grid interconnection under new UL 1741 multipiece distributed energy resources requirements coupled with UL 9741, the standard for electric vehicle power export equipment. Testing and certification services are available at UL Solutions laboratories in Fremont, California and Northbrook, Illinois.

Why it matters

The certification programme provides a clear compliance pathway for manufacturers developing bidirectional charging equipment, potentially accelerating V2G deployment by standardising testing requirements for equipment that bridges EVs and utility grids. For charge point operators and procurement teams, certified products offer assurance of interoperability and grid interconnection compliance, reducing technical risk in V2G projects.

Source

Original title
“UL Solutions launches V2G certification programme”
Published
17 September 2026
Updated
18 September 2026

In this story

Related news

DTEK restored power to more than 6.7 million families in October after Russian attacks

According to a Ukrainian-language report, DTEK crews restored electricity in October to more than 6.7 million families in Kyiv, and the Kyiv, Odesa, Dnipropetrovsk and Donetsk regions, fully or partly reconnecting over 2,200 settlements. Kyiv accounted for more than 2 million homes, Donetsk region 1.47 million, Dnipropetrovsk region 1.42 million, Kyiv region almost 1 million and Odesa region 812,800. DTEK said repair work starts only after clearance from the armed forces and the State Emergency Service, and that overnight on 31 October Russian forces again struck energy sites in Dnipropetrovsk region, seriously damaging equipment at two DTEK Dnipro Electric Networks facilities.

Why it matters

Repeated damage to distribution networks in these regions affects grid reliability and connection timelines for any charging project in Ukraine. Developers and CPOs should factor in supply interruption risk, on-site resilience and access constraints when planning sites and contracts.

Ukraine
2 Nov 2026

ДТЕК · Source

DTE Energy and Sonnen to link nearly 100 home batteries in Michigan's first residential virtual power plant pilot

DTE Energy and battery manufacturer Sonnen will coordinate nearly 100 home batteries in Ann Arbor, Michigan, in a two year pilot announced on 29 October and approved by the Michigan Public Service Commission. The batteries sit in Thrive Collaborative's carbon neutral Veridian at County Farm development, and DTE will assess whether coordinated storage can lower system costs, improve reliability and meet peak demand more cheaply than building new capacity. The details come from a DTE and Sonnen news release published by The Manila Times and reported by The Cool Down.

Why it matters

Utilities testing aggregated residential storage as an alternative to new capacity signals a growing focus on flexible, coordinated load and supply, which can shape how charging sites are planned, connected and priced in the same networks. CPOs and procurement teams should watch the pilot's findings for what they mean for peak demand management and grid support models.

United States
2 Nov 2026

DTE Energy · Source

Chhattisgarh seeks ₹5.6 lakh crore of energy investment and targets 15,000 MW of green capacity by 2030

Chief Minister Vishnu Deo Sai told the Bharat Renewable Energy Summit and Expo 2026 in New Delhi that the state wants ₹5.60 lakh crore over five years, including ₹1.33 lakh crore for 23,923 MW of renewable projects and about ₹3.27 lakh crore for thermal expansion, according to an official statement. The state aims to lift green energy's share of electricity demand from 15% to more than 45% by 2030, and has identified 10 pumped storage projects totalling 12,300 MW (about ₹65,000 crore) alongside plans for 10,000 MWh of battery storage. Chhattisgarh currently has more than 28,000 MW of coal based thermal capacity.

Why it matters

A cleaner grid mix and large storage pipeline in a coal heavy state could shape future power cost and availability for charging operators, though the report does not mention EV charging directly. Procurement teams should watch how the renewable and storage opportunities turn into tenders.

India
2 Nov 2026

Source