Walmart opens 100th company-owned EV fast-charging site in Colorado
By Eve
Walmart has reached 100 company-owned and operated EV fast-charging locations across 20 US states, with the milestone site opening at its Monument, Colorado Supercenter. Most sites feature eight to 16 fast-charging connectors delivering up to 400 kilowatts, supporting both CCS and NACS standards. Walmart+ members receive discounted rates, with payment handled through the Walmart app.
Why it matters
The rollout demonstrates how major retailers are building proprietary charging networks at scale, creating a new competitive channel for CPOs and equipment suppliers. Walmart's dual-standard infrastructure and app-based payment model may set procurement expectations for other anchor-tenant deployments.
Source
- Source
- https://www.cspdailynews.com/technologyservices/walmart-opens-100th-ev-fast-charging-site-colorado
- Original title
- “Walmart reaches 100-store milestone with EV fast-charging launch in Monument, Colorado”
- Published
- 28 August 2026
- Updated
- 3 September 2026
- Also covered by
- cspdailynews.com
In this story
- Topic
- EV Charging
- Place
- United States
- Tag
- Walmart
Related news
Rivian electric van spotted in Walmart+ livery, hinting at a fleet deal
A Rivian electric delivery van wrapped in Walmart+ branding was photographed on a car hauler in northwest Indiana, marking the first public sign that Walmart could become Rivian's next major van customer after Amazon. Neither company has announced a deal. A second photo showed a similarly liveried van parked at a Walmart Supercenter in Hammond, Indiana, about 30 miles away. Rivian stock rose more than 3% following the sighting, two days before the company reports Q3 2026 results on 29 October.
Why it matters
Walmart has been seeking to electrify last mile delivery for years, and its previous electric van suppliers are no longer in business, creating a potential procurement opportunity. Rivian is one of the few companies still building a purpose built electric delivery van in the US, positioning it as a likely supplier if Walmart moves forward with a fleet order.
Solar powered EV charging in Andhra Pradesh still at an early stage despite favourable conditions
A report on Nellore says Andhra Pradesh has abundant sunshine, a growing renewable energy ecosystem and rising interest in electric mobility, but solar powered charging remains nascent. Stations use rooftop or ground mounted solar panels with Battery Energy Storage Systems (BESS) to smooth fluctuations, drawing from the grid only when necessary. The article notes that public charging infrastructure in the state remains sporadic despite growing EV sales and strong government backing, and that Convergence Energy Services Ltd. (CESL), a subsidiary of Energy Efficiency Services Ltd. (EESL), was the first to deploy an integrated solar powered charging station in India.
Why it matters
Lower electricity costs at solar and BESS equipped sites could let charge point operators pass savings on to drivers, which makes Andhra Pradesh a potential market for integrated solar plus storage charging projects. The patchy public network, particularly for intercity travel, points to unmet demand for developers and funders.
Los Alamos County to open new DC fast charging stations at Mesa Public Library with ribbon cutting on 2 November
Los Alamos County has invited the community to a ribbon cutting ceremony on 2 November marking the opening of new Direct Current (DC) fast charging stations in the Mesa Public Library parking lot. The project was funded in part by the New Mexico Department of Transportation (NMDOT). County Sustainability Manager Angelica V. Gurule described the stations as a step toward expanding public EV charging infrastructure and supporting more sustainable transport in the community.
Why it matters
This is another example of state transport funding supporting municipal DC fast charging at public civic sites, a route that can open opportunities for CPOs and installers working with local authorities. The announcement gives no figures on charger count, power output or funding value, so those details would need to be confirmed directly.