West Sussex passes 1,000 live public EV charging sockets
By Eve
West Sussex County Council reports 1,030 live sockets on its Chargepoint Network, delivered with Connected Kerb under a contract signed in November 2021, with first installations starting in mid-2022. Since May 2022 the network has recorded about 77,000 charging sessions from roughly 14,000 users, supplying around 1.79 million kWh. The rollout is facilitated by the Government-funded LEVI Pilot Scheme, with active charge points installed alongside passive underground infrastructure for future additional sockets.
Why it matters
The county shows how an on-street programme for residents without off-street parking can scale through a single delivery partner and LEVI Pilot funding. The passive infrastructure approach and evidence-led site selection offer a reference model for bidders and CPOs planning future expansion.
Source
- Original title
- “West Sussex celebrates 1,000 live socket milestone”
- Published
- 3 November 2026
- Also covered by
- Google News
In this story
- Topic
- EV Charging
- Place
- United Kingdom
- Tag
- West Sussex
Related news
ChargeZone says India's EV charging should be judged on energy delivered, not charger numbers
Speaking at the Autocar Professional India EV Conclave 2026 in New Delhi, ChargeZone Co-Founder and Director, Strategy, Ravindra Mohan said the sector should be measured by the energy delivered to vehicles rather than chargers installed. He said the company has electrified approximately 45,000 km of highways through around 1,500 of its own charging points, with reported uptime of approximately 98.6%, while acknowledging that grid interruptions can affect customer experience. The discussion also covered high-power charging for commercial vehicles, second-life EV batteries and plans to turn charging stations into energy assets through battery storage and renewable electricity.
Why it matters
A shift from counting chargers to measuring energy delivered and uptime points to performance metrics that tenders and funding decisions may increasingly reward. The focus on storage, renewables and grid resilience also signals where CPOs may need to invest to protect reliability and customer experience.
Bolt.Earth commissions 1.5 MW EV charging station at P Qube Solutions in Vijayawada
Bolt.Earth has commissioned a 1.5 MW charging station at P Qube Solutions in Nunna, Vijayawada, Andhra Pradesh, near the NH-16 Cross. The site has two 240 kW, three 180 kW and one 60 kW DC fast chargers for cars, trucks and buses, plus a 6 kW fast charger for three-wheelers, two 3 kW DC fast chargers for two-wheelers and four 3.3 kW AC sockets. It is intended to serve local demand and intercity EV traffic on the highway corridor.
Why it matters
The site shows a charge point operator partnering with a host to combine heavy-duty, car and light vehicle charging at one location on a highway corridor. Site-operator partnerships are being positioned as the route to expanding charging beyond established urban markets in India.
Mercedes-Benz sells its European charging network to Electra
Mercedes-Benz has exited EV charging in Europe by selling its network to French operator Electra, a move disclosed in its third-quarter financial report, which valued the associated assets at €99 million ($111 million). The network comprised 374 fast-charging ports at 47 locations, all of which now join Electra's network, as first reported by Electrive. Electra becomes a "Premium Partner" second only to Ionity, and Mercedes-Benz drivers get discounted rates at over 5,000 Electra chargers across 800 locations, while the US fast charging business is unaffected.
Why it matters
A premium OEM stepping back from owning charging infrastructure in Europe and leaning on partners such as Ionity and Electra shows where OEM demand is heading, towards partnership and roaming deals rather than proprietary builds. CPOs with strong coverage and reliability have a clear route to OEM tie-ups, and Electra has gained sites and a favoured partner position.