Würth Elektronik ICS launches PowerBusbar PF, a vertical press-fit busbar for PCBs
By Eve
Würth Elektronik ICS has introduced the PowerBusbar PF, a busbar that is press-fitted vertically into a printed circuit board to save space and add current-carrying capacity only where needed. It comes in four standard sizes, with lengths from 19 to 59 mm, a height of 18.4 mm and a thickness of 1.2 mm, and units can be combined into modular current paths or used as a high-current bridge. The company says it targets electric mobility, energy storage and industrial automation, and that using standard FR4 boards instead of heavy-copper PCBs can save material and cost (as reported in a Newswire item dated 23 November 2026).
Why it matters
For charger and power electronics designers, it offers a way to carry high currents without specifying heavy-copper boards, which could cut board cost and widen the choice of PCB suppliers. Buyers assessing charger hardware may want to ask manufacturers whether such components feature in their power stage designs.
Source
- Original title
- “Würth Elektronik ICS introduces PowerBusbar PF, a vertical press-fit busbar for PCBs”
- Published
- 23 November 2026
- Updated
- 24 November 2026
In this story
- Topic
- EV Charging
- Place
- Global
Related news
Chargemap confirms user data theft linked to an old technical interface
Chargemap told users on 18 November 2026 that their data had been stolen, according to its communication as reported by Next and Bevolt. The attack reportedly took place on 8 November, was detected on 10 November and the flaw was fixed on 12 November, with an old technical interface said to be the cause. Exposed data includes email address, username and app language, and depending on the account may also include identity, phone number, date of birth, city, profile photo, subscription status and Google, Facebook or Apple login identifiers. Some former users who deleted their accounts may also be affected, and the company says it has notified the CNIL and is starting a complaint procedure.
Why it matters
Charge point operators and procurement teams that rely on Chargemap for driver discovery, roaming or app integrations should review their data sharing arrangements and security due diligence. The reported cause, a legacy interface, and the possible exposure of deleted accounts are reminders to test data retention and decommissioning as part of supplier assessments.
ChargePoint partners with Kässbohrer to bring DC fast chargers to ski resorts
ChargePoint has partnered with Kässbohrer, maker of the PistenBully slope groomer, to target ski resorts in North America and Europe. The partnership, effective immediately, puts Kässbohrer's customers, from ski resort operators to public parking operators, in direct contact with ChargePoint's hardware and software. Resorts and indoor ski facilities can access a charging ecosystem for electric snow groomers and other EVs in their fleets, according to InsideEVs.
Why it matters
Ski resorts and similar sites are a niche channel for heavy-duty and fleet charging, reached through an established equipment maker's customer base rather than through conventional site acquisition. CPOs and installers may see new demand at remote, cold-climate locations where charger selection could be shaped by the Kässbohrer relationship.
PLUG Charging launches in-house maintenance division and hires Cardiff field engineer
PLUG Charging has brought the testing, inspection, fault response and maintenance of its EV charging network fully under its own management through a new in-house division. Field Engineer Connor Ogden, formerly an Approved Electrician at Virtua UK Ltd, has joined in Cardiff to establish the service, focusing on resilience for depot charging active with Welsh authorities and fault response at PLUG's public charging locations. The company said the move gives it direct control over response times and service quality.
Why it matters
For public sector fleet buyers and CPOs, an operator that handles maintenance in-house offers a clearer line of accountability on uptime than one relying on subcontracted service. It is a signal to test operations and maintenance claims, response commitments and local engineering capacity when assessing charging suppliers.