Skip to content
EV Charging
Ireland

ZEVI expands electric truck grants to €500,000 but public charging network lags freight needs

By Eve

Zero Emission Vehicles Ireland has increased support for heavy-duty electrification, offering businesses up to €500,000 per year for zero-emission truck purchases and up to €300,000 for depot charging infrastructure under the Zero-Emission Heavy Duty Vehicle Purchase Grant Scheme. Grant levels are tiered by company size, covering 30 per cent to 60 per cent of the price difference between electric and diesel trucks, with applications required before vehicle orders. Despite the expanded funding, Ireland's public charging network stood at 3,428 points across 1,150 locations in June 2026, with €20 million allocated for 266 additional high-powered stations.

Why it matters

The scheme creates immediate procurement opportunities for depot charging installations and electrical upgrades, though the limited public charging rollout signals that return-to-base fleet operators will remain the primary near-term market. CPOs and contractors should note that infrastructure grants require pre-approval, narrowing the window for speculative project development.

Source

Original title
“ZEVI backs electric trucks—but charging gap remains”
Published
20 September 2026
Updated
23 September 2026

In this story

Related news

Electrify America operates 6,029 DC fast-charging ports across 1,191 US sites

Electrify America now runs 6,029 DC fast-charging ports at 1,191 locations in the United States, making it the second largest DC charging network after Tesla Supercharger, according to InsideEVs citing the US Department of Energy's Alternative Fuels Data Center. Over the past year, the network's port count grew by 16% and station count by around 10%, with 202 ports added in the second quarter alone, representing 6.7% of all US DC fast-charging ports. ChargePoint, the third largest operator, installed 333 ports in the same quarter and holds 6.1% market share, while Walmart's network added more ports than any other non-Tesla company in the quarter, reaching 916 ports across 110 stations.

Why it matters

The figures confirm Electrify America's dominant position among non-Tesla networks and provide procurement teams with current scale benchmarks for the US fast-charging market. Walmart's aggressive second quarter rollout signals a major retail-led expansion that could reshape site partnership opportunities for CPOs and equipment suppliers.

United States
12 Oct 2026

Electrify America · Source

Queue and reservation hardware shifts from niche to core layer as high utilisation sites hit capacity limits

The global market for public EV charging queue and reservation hardware is entering structural expansion as charge point operators face physical limits at high utilisation sites, according to an IndexBox report entering 2026. Demand is splitting between integrated systems for new high power hubs and retrofit solutions for existing stations. The hardware includes integrated displays, sensors, payment terminals, communication modules and access controllers, with supply chains characterised by validation requirements where approved vendor status with major CPOs and Tier 1 integrators often matters more than unit cost.

Why it matters

CPOs planning procurement must now evaluate queue management as core infrastructure rather than optional add on, with vendor selection increasingly driven by validation and integration partnerships rather than price alone. The bifurcation between new build and retrofit creates distinct channel and specification strategies for operators upgrading networks.

Global
12 Oct 2026

Source

E.ON acquires former BP Pulse EV charging network in the Netherlands from Catom

E.ON has bought the EV charging business from Dutch fuel distributor Catom, which had acquired BP's petrol station and charging operations in the country last year. The portfolio includes 17 fast charging hubs with Alpitronic chargers delivering up to 300kW, 51 battery buffered sites for grid constrained locations, and 45 secured development sites for future rollout. E.ON Infrastructure will own and maintain the assets while sister utility Essent will handle customer facing operations and marketing, with sites rebranded to Essent and chargers carrying E.ON branding.

Why it matters

The deal consolidates a ready built Dutch charging estate under a major European utility, giving E.ON immediate scale in a market where battery buffered sites address grid capacity constraints. The 45 secured development sites offer a clear pipeline for staged expansion, while the dual brand model separates infrastructure ownership from customer operations.

Netherlands
12 Oct 2026

E.ON · BP Pulse · Source