Search: Plug Inn

Published stories matching “Plug Inn”.

  • Denver Public Schools has deployed a Kempower distributed charging system at its Hilltop Bus Terminal to support a fleet of 28 electric school buses, including 25 newly added Blue Bird Vision models. The installation, led by electrical solutions provider Winn-Marion, comprises 650 kilowatts of total power delivered through 13 dual-port Kempower Satellite dispensers, providing 26 charging plugs with dynamic power distribution. PowerFlex (formerly The Mobility House) supplied smart charging and energy management technology for the project, announced in August 2026.

    Why it matters: The project demonstrates a scalable depot charging model for school districts electrifying fleets, with distributed architecture allowing dynamic power sharing across multiple vehicles to meet tight operational schedules. It highlights Kempower's growing presence in the US school bus segment and the role of integrators like Winn-Marion in delivering turnkey charging solutions for public sector clients.

    Denver Public SchoolsKempowerUnited States26 Aug 2026Source
  • Kempower analyzed North American public charging sites connected to its ChargEye cloud software and found plug count had a correlation of 0.63 with site utilization, compared with just 0.228 for installed power. Sites with eight plugs delivered 128,342 kWh versus 61,453 kWh at four plug sites, more than double the energy. The Finnish manufacturer's distributed charging setup connects multiple plugs to a centralized power unit, with software dynamically distributing available power.

    Why it matters: The findings suggest charge point operators may achieve better returns by prioritizing plug availability over maximum power per charger, reshaping procurement strategies around access rather than peak charging speed alone. Kempower's data indicates infrastructure utilization depends more on serving multiple vehicles simultaneously than on deploying the highest power ratings at fewer points.

    Kempower25 Aug 2026Source
  • Walmart has reached 100 company-owned EV fast-charging sites spanning 20 states, with the milestone location in Monument, Colorado featuring eight plugs (four CCS1, four NACS) capable of up to 400 kW. Most Walmart sites deploy eight to 16 plugs using ABB A400 All-in-One and Alpitronic HYC400 Hypercharger units, which can deliver 200 kW to two vehicles simultaneously or 400 kW to one. A GMC Hummer EV test at a McKinney, Texas site demonstrated over 300 kW charging, reaching 1% to 53% in 27 minutes.

    Why it matters: The 100-site milestone signals Walmart's rapid scaling of owned charging infrastructure, creating procurement opportunities for ABB and Alpitronic hardware across a growing multi-state network. The retailer's dual-standard (CCS1 and NACS) rollout and high-power hardware choices set a benchmark for site design and supplier selection in the retail charging segment.

    WalmartUnited States21 Aug 2026Source
  • MG will fit its next-generation plug-in hybrids with SolidCore semi-solid-state battery technology starting in 2027, beginning with the MG ZS and followed by the HS and S9 models. The technology, which debuts first in the MG 4 EV Urban hatchback, promises improved range, faster charging and better cold-weather performance, while enabling PHEVs to use smaller combustion engines (1.1-litre with 98bhp or 1.5-litre with 161bhp). MG plans to make SolidCore its predominant battery technology as it develops full solid-state batteries for the future.

    Why it matters: The shift to semi-solid-state batteries in mass-market PHEVs signals a potential step change in charging infrastructure requirements, as faster charging and improved cold-weather performance may alter demand patterns at public charge points. Fleet operators and CPOs serving mixed EV and PHEV fleets should monitor how the technology affects utilisation rates and power delivery needs from 2027 onwards.

    MG (global)Global9 Jul 2026Source
  • Renault Group has rebranded its electric vehicle charging operations as Plug Inn, integrating activities previously run under Mobilize Beyond Automotive directly into core business. The rebrand covers three product lines: Plug Inn Powerbox for bidirectional V2G charging, Plug Inn Charge Pass for public charging access, and Plug Inn Fast Charge for the company's rapid charging network. Name changes for the charging services will roll out by the end of 2025, following a December restructuring that discontinued the group's e-carsharing offer.

    Why it matters: The consolidation signals Renault's commitment to charging infrastructure as a core revenue stream rather than a separate venture, potentially streamlining procurement processes and partnership terms for charge point operators working with the automaker. A unified brand may also simplify contract negotiations and hardware sourcing for fleets and site hosts already engaged with Renault's mobility ecosystem.

    Renault Group (fr)Plug Inn (fr)GlobalFrance8 Apr 2026 · date approximateSource
  • Tellus Power has launched two new 600 kW DC fast charging units featuring distributed architecture, NACS and CCS connector support, and Plug & Charge capability. The company is addressing industry debates over standalone versus distributed charging systems, user interface design, and payment methods including credit card readers. The announcement was published on 25 February 2026 in a feature examining technical innovations in the fast charging sector.

    Why it matters: Procurement teams evaluating high power charging infrastructure now have a new 600 kW option that supports both major connector standards and offers flexible architecture choices. The inclusion of Plug & Charge and multiple payment methods addresses key operational and customer experience requirements for CPOs planning large scale deployments.

    Tellus Power (global)Global25 Feb 2026 · date approximateSource
  • A federal judge has vacated seven termination notices after the US Department of Energy cancelled $7.5 billion in financial awards, ruling the action violated equal protection guarantees. The lawsuit was brought by St. Paul, Minnesota, and a coalition including Elevate Energy, the Environmental Defense Fund, the Interstate Renewable Energy Council, Plug In America and the Southeast Community Organization. The DOE said it disagrees with the decision and defended its review process, though it did not confirm whether it would appeal.

    Why it matters: The ruling restores billions in federal funding that could support EV charging infrastructure and related clean energy projects, providing renewed certainty for grant recipients and developers. The decision may influence how future federal energy awards are administered and challenged.

    Trump administration (us)United States13 Jan 2026 · date approximateSource