Skip to content
EV Charging
Germany
Global

CUBOS acquires TotalEnergies' commercial EV charging business in Germany

By Eve

German energy services provider CUBOS has acquired TotalEnergies' entire commercial charging operation in Germany, adding around 6,000 AC and DC charging points to its network. The deal, announced in July 2026, takes CUBOS to more than 15,000 charging points serving over 1,000 business customers and grows its team to more than 500 people, with all existing jobs retained. The acquisition follows CUBOS's purchases of SWARCO in December 2025 and ChargeOne in April 2026.

Why it matters

The transaction marks a significant consolidation in Germany's commercial charging market, with CUBOS rapidly scaling through three major acquisitions in eight months to become a dominant B2B operator. Procurement teams and CPOs should note CUBOS's platform strategy integrating charging hardware, software, solar and battery storage under one provider, which may reshape competitive dynamics and service offerings in the German market.

Source

Original title
“CUBOS acquires TotalEnergies’ commercial EV charging business in Germany”
Published
8 July 2026 (date approximate)
Updated
22 September 2026
Also covered by
Google News (1, 2, 3)

In this story

Related news

TotalEnergies appointed to deliver more than 1,500 22 kW chargers in Tower Hamlets under LEVI

Tower Hamlets Council has appointed TotalEnergies to deliver more than 1,500 new 22 kW AC charging points across the east London borough, the first LEVI-funded charging contract awarded in the capital. The first installation is scheduled for December at Pritchards Road, with the rollout continuing over the following four years. The borough is receiving a share of more than £1.2 million in government investment, which the council said can help unlock private-sector funding, and TotalEnergies will supply all electricity from renewable sources.

Why it matters

This is a London LEVI award to an established operator with more than 3,200 charge points in the capital, a useful signal for how boroughs are structuring on-street contracts. With 93% of Tower Hamlets households lacking off-street parking and the borough already at around 2,350 public charge points, it shows where demand and council appetite are strongest.

United Kingdom
23 Nov 2026

TotalEnergies · Source

MAHLE introduces Park & Charge pilot combining autonomous parking with wireless EV charging up to 11 kW

MAHLE has introduced a Park & Charge pilot for automakers that pairs autonomous parking with contact-free inductive charging. Vehicle cameras and AI-based algorithms identify compatible charging bays without extra sensors, and the Differential Inductive Positioning System (DIPS), which SAE International declared a global industry standard two years ago, aligns the vehicle over the ground pad. The system supports charging up to 11 kW at more than 92 percent efficiency under real-world vehicle conditions, includes bidirectional capability, and is being evaluated with the BMW Group in a BMW iX3, with a converted engine test cell in Stuttgart serving as the wireless charging test bench.

Why it matters

MAHLE names car rental, logistics and delivery fleets as target users, so depot operators and CPOs may need to consider ground pad infrastructure and automated bay alignment in future site designs. It is still a pilot with an OEM evaluation, so near-term procurement impact is limited, but it signals where hands-free fleet charging may head.

Global
26 Nov 2026

MAHLE (global) · Source

Urven unveils Urven Charger Park, a solar carport with EV charging that needs no conventional construction

Spanish start-up Urven, working with Bexie Energy, has launched Urven Charger Park, a modular system combining a solar carport with EV charging. It is self-supporting and uses prefabricated concrete ballast blocks instead of reinforced concrete foundations, with the two structures shown using bases of 2,500 kg and 3,500 kg. Parts are prepared in the factory so no cutting or drilling is needed on site, though fixing points are still required to meet local building regulations. The system was shown at the Genera trade fair in Madrid and is built on Urven's L Series solar carport range, as reported by a Turkish technology outlet.

Why it matters

Removing foundation works could shorten installation time and lower civil engineering cost and risk on car park sites, which is relevant to rollout speed and site selection. Buyers should still check the required fixing points and local building rules, as the report gives no pricing, charger power ratings or delivery timelines.

Turkey
26 Nov 2026

Donanım Haber (tr) · Source